Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0724-00815
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/17/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 10/17/24: seal penetrations through top plate, shear wall 11 or greater requires 3”x3” washer plates, seal penetrations through vapor barrier, properly secure flex duct throughout, damaged wiring in bedroom 3, FHA plate at Kitchen exhaust hood missing, bathroom exhaust fan missing, fan fixtures must be properly secured ( drywall screws are not permitted), caulk all staples going through vapor barrier, nail plates required through, mechanical not ready, pex not under pressure. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. | |
10/22/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | fan fixtures must be properly secured ( drywall screws are not permitted). Replace fresh air intake due to water trapped. Water lines are not under pressure. Foam top penetration at FHA plate. Secure loose electrical lines in ceiling. 10/22/2024 | |
10/24/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10/17/24: seal penetrations through top plate, shear wall 11 or greater requires 3”x3” washer plates, seal penetrations through vapor barrier, properly secure flex duct throughout, damaged wiring in bedroom 3, FHA plate at Kitchen exhaust hood missing, bathroom exhaust fan missing, fan fixtures must be properly secured ( drywall screws are not permitted), caulk all staples going through vapor barrier, nail plates required through, mechanical not ready, pex not under pressure. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. fan fixtures must be properly secured ( drywall screws are not permitted). Replace fresh air intake due to water trapped. Water lines are not under pressure. Foam top penetration at FHA plate. Secure loose electrical lines in ceiling. 10/22/2024 10/24/24: corrections made ok to proceed. |