Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Partial Pass

Inspection History: COT - RSEL - Grounding/Bonding 

Permit Number - TC-MDP-0724-00815

Inspection Description - COT - RSEL - Grounding/Bonding 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
08/21/2024 COT - RSEL - Grounding/Bonding  Partial Pass Concrete forms are set, post tension cabling is properly spaced per the plans, masa clips are nailed to form 36" apart, additional rebar reinforcement is installed in corners of garage footing and around tub and shower block outs, Ufer ground rebar is in place on side of garage where transformer sets, underground electrical conduit is in place for kitchen island, and all underground plumbing pipes are properly wrapped with foam wrapping. Okay to pour concrete for footings and slab on grade.
10/17/2024 COT - RSEL - Grounding/Bonding  Re-inspection required Concrete forms are set, post tension cabling is properly spaced per the plans, masa clips are nailed to form 36" apart, additional rebar reinforcement is installed in corners of garage footing and around tub and shower block outs, Ufer ground rebar is in place on side of garage where transformer sets, underground electrical conduit is in place for kitchen island, and all underground plumbing pipes are properly wrapped with foam wrapping. Okay to pour concrete for footings and slab on grade.
10/17/24: seal penetrations through top plate, shear wall 11 or greater requires 3”x3” washer plates, seal penetrations through vapor barrier, properly secure flex duct throughout, damaged wiring in bedroom 3, FHA plate at Kitchen exhaust hood missing, bathroom exhaust fan missing, fan fixtures must be properly secured ( drywall screws are not permitted), caulk all staples going through vapor barrier, nail plates required through, mechanical not ready, pex not under pressure. STOPPED INSPECTION MORE ITEMS MAY BE ADDED.
10/22/2024 COT - RSEL - Grounding/Bonding  Passed