Permit: TC-MDP-0623-01148
Permit Details
Apply Date:
08/10/2023
Applicant:
Daria Hopkins
Description:
SFR MERI213021 T21-M0065
Permit Reviews
Permit Number - TC-MDP-0623-01148
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/14/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/16/2024 | APPROVED |
08/11/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 08/15/2023 | APPROVED |
10/02/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/02/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0623-01148
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Date | Description | Comments |
---|---|---|
10/02/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
08/11/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
08/11/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
08/14/2023 | Post-Tension Inspection Report is required. | |
06/09/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
10/16/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
08/11/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
08/14/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01148
Permite Description: SFR MERI213021 T21-M0065
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/03/2024 | COT - RSBU - Exterior Clips/Sheathing | N/A | Not Ready | |
12/29/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | House has been lathed and proceeded to intermediate without passing exterior clips and sheathing. Remove ALL lath to conduct proper inspection. |
04/10/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 4/10/24: Engineering final must pass prior to final, exterior pipes must be UV coated, 90 degree missing at drain on exterior of house, Clean out cover missing at first floor bathroom, faceplate at switch box in attic not installed, no attic access. |
04/10/2024 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 4/10/24: Engineering final must pass prior to final, exterior pipes must be UV coated, 90 degree missing at drain on exterior of house, Clean out cover missing at first floor bathroom, faceplate at switch box in attic not installed, no attic access. |
04/10/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 4/10/24: Engineering final must pass prior to final, exterior pipes must be UV coated, 90 degree missing at drain on exterior of house, Clean out cover missing at first floor bathroom, faceplate at switch box in attic not installed, no attic access. |
04/10/2024 | RSBU - Building Final | N/A | Re-inspection required | 4/10/24: Engineering final must pass prior to final, exterior pipes must be UV coated, 90 degree missing at drain on exterior of house, Clean out cover missing at first floor bathroom, faceplate at switch box in attic not installed, no attic access. |
04/10/2024 | ENGR Engineering Final | N/A | Not Ready | Site not ready. 1) Port-A-Jon in driveway 2) Front walk to front door not yet poured. 3) Grade does not appear to be correct on either side of home. Please provide document showing positive drainage to front. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01148
Permit Description: SFR MERI213021 T21-M0065
Total Completed Inspections - 22