Inspection Status: Re-inspection required
Inspection History: COT - RSEL - Electrical Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/10/2024 |
COT - RSEL - Electrical Final |
|
Re-inspection required |
4/10/24: Engineering final must pass prior to final, exterior pipes must be UV coated, 90 degree missing at drain on exterior of house, Clean out cover missing at first floor bathroom, faceplate at switch box in attic not installed, no attic access. |
| 04/12/2024 |
COT - RSEL - Electrical Final |
|
Canceled |
|
| 04/17/2024 |
COT - RSEL - Electrical Final |
|
Passed |
|