Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required (with fee)
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0623-01148
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required (with fee)
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/16/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required (with fee) | House has been lathed and proceeded to intermediate without passing exterior clips and sheathing. Remove ALL lath to conduct proper inspection. 1/16/24: lath has been installed to house without passing previous inspection, remove all lath so exterior clip and sheathing inspection can be performed properly. While walking house multiple anchor bolts were not properly fastened. STOPPED INSPECTION. |
|
01/18/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | Cancelled per Trent. | |
01/19/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
12/29/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | House has been lathed and proceeded to intermediate without passing exterior clips and sheathing. Remove ALL lath to conduct proper inspection. |