Permit: TC-MDP-0524-00634
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12859 E TORTOISE POINTE DR
Address NEW:
12859 E TORTOISE POINTE DR
Apply Date:
05/13/2024
Applicant:
Description:
SFR RKF55I T21-M0086
Permit Reviews
Permit Number - TC-MDP-0524-00634
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/24/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/25/2024 | APPROVED |
| 06/27/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00634
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 05/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 06/25/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 06/25/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 06/25/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 06/25/2024 | Post-Tension Inspection Report is required. |
| 06/25/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0524-00634
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
| Date | Description | Comments |
|---|---|---|
| 05/17/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/25/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00634
Permite Description: SFR RKF55I T21-M0086
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2024 | BULD - Electrical Clearance | N/A | Re-inspection required | 11-13-24, electrical panel not ready for temp power. |
| 11/13/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 11-13-24, pancake box overfilled at garage exterior lights. Box is rated for 6 cubic inches and contains 2 14/2 awg wires. Nail down all h25's at interior framing, electrical panel not ready for temp power. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00634
Permit Description: SFR RKF55I T21-M0086
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/23/2024 | COT - RSPL - Backwater Valve | Passed | Underground plumbing is complete and properly connected to main sewer line, green tracer wire is installed from clean-outs to sewer connection, backwater valve is installed between clean outs, and entire system is under a water test. Okay to shade pipes and backfill trenches. | |
| 08/23/2024 | COT - RSPL - Sewer | Passed | Underground plumbing is complete and properly connected to main sewer line, green tracer wire is installed from clean-outs to sewer connection, backwater valve is installed between clean outs, and entire system is under a water test. Okay to shade pipes and backfill trenches. | |
| 08/23/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is complete and properly connected to main sewer line, green tracer wire is installed from clean-outs to sewer connection, and entire system is under a water test. Okay to shade pipes and backfill trenches. | |
| 09/05/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is properly spaced, additional rebar reinforcement is installed per plan requirements, Ufer ground is in place, masa clips and shear wall hold downs are installed per plan requirements, underground electrical is in place for kitchen island, and all underground plumbing pipes are properly wrapped with foam wrap. Okay to pour concrete. | |
| 09/05/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is properly spaced, additional rebar reinforcement is installed per plan requirements, Ufer ground is in place, masa clips and shear wall hold downs are installed per plan requirements, underground electrical is in place for kitchen island, and all underground plumbing pipes are properly wrapped with foam wrap. Okay to pour concrete. | |
| 09/05/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 10/21/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 10/21/24: All items noted on last inspection have been corrected. Okay to proceed with rough-in of M, P, AND E. | |
| 10/21/2024 | COT - RSBU - Roof Nailing | Passed | 10/21/24: All items noted on last inspection have been corrected. Okay to proceed with rough-in of M, P, AND E. | |
| 11/13/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11-13-24, approved. | |
| 11/13/2024 | COT - RSEL - Grounding/Bonding | Passed | 11-13-24, approved | |
| 11/13/2024 | COT - RSPL - Gas Pressure Test | Passed | 11-13-24, gas pressure test approved | |
| 11/15/2024 | BULD - Electrical Clearance | Passed | 11-15-24, electrical panel approved for power. | |
| 11/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 11-15-24, items from previous inspection have been corrected. Intermediates approved-okay to continue with construction. | |
| 12/04/2024 | COT - RSBU - Interior Shear Bracing | Passed | 12-4-24, approved. Okay to tape & texture drywall. | |
| 02/05/2025 | COT - BULD - SWG Clearance | Passed | Passed CLEARANCE SWG 2/5/25 | |
| 02/12/2025 | COT - RSEL - Electrical Final | Passed | Passed final 2/12/25 | |
| 02/12/2025 | COT - RSEL - Outdoor Lighting | Passed | passed 2/12/25 | |
| 02/12/2025 | COT - RSME - Mechanical Final | Passed | passed 2/12/25 | |
| 02/12/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 2/12/25 | |
| 02/12/2025 | ENGR Engineering Final | Passed | Site looks good. | |
| 02/12/2025 | RSBU - Building Final | Passed | Passed final 2/12/25 | |
| 02/12/2025 | RSBU - Building Progress | Passed | passed 2/12/25 |