Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
05/13/2024
Applicant:
Description:
SFR RKF55I T21-M0086

Permit Reviews

Permit Number - TC-MDP-0524-00634
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
Start Date Submittal Complete Date Status  
06/24/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/25/2024 APPROVED Review Details
06/27/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/01/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0524-00634
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
Total Outstanding Activity Conditions - 6
Date Name
05/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/25/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/25/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/25/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/25/2024 Post-Tension Inspection Report is required.
06/25/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0524-00634
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
Date Description Comments
05/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/25/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00634
Permite Description: SFR RKF55I T21-M0086
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
11/13/2024 BULD - Electrical Clearance N/A Re-inspection required 11-13-24, electrical panel not ready for temp power.
11/13/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 11-13-24, pancake box overfilled at garage exterior lights. Box is rated for 6 cubic inches and contains 2 14/2 awg wires. Nail down all h25's at interior framing, electrical panel not ready for temp power.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00634
Permit Description: SFR RKF55I T21-M0086
Total Completed Inspections - 22
Date Description Inspector Results Comments
08/23/2024 COT - RSPL - Backwater Valve Passed Underground plumbing is complete and properly connected to main sewer line, green tracer wire is installed from clean-outs to sewer connection, backwater valve is installed between clean outs, and entire system is under a water test. Okay to shade pipes and backfill trenches.
08/23/2024 COT - RSPL - Sewer Passed Underground plumbing is complete and properly connected to main sewer line, green tracer wire is installed from clean-outs to sewer connection, backwater valve is installed between clean outs, and entire system is under a water test. Okay to shade pipes and backfill trenches.
08/23/2024 COT - RSPL - Rough Soil Passed Underground plumbing is complete and properly connected to main sewer line, green tracer wire is installed from clean-outs to sewer connection, and entire system is under a water test. Okay to shade pipes and backfill trenches.
09/05/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is properly spaced, additional rebar reinforcement is installed per plan requirements, Ufer ground is in place, masa clips and shear wall hold downs are installed per plan requirements, underground electrical is in place for kitchen island, and all underground plumbing pipes are properly wrapped with foam wrap. Okay to pour concrete.
09/05/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is properly spaced, additional rebar reinforcement is installed per plan requirements, Ufer ground is in place, masa clips and shear wall hold downs are installed per plan requirements, underground electrical is in place for kitchen island, and all underground plumbing pipes are properly wrapped with foam wrap. Okay to pour concrete.
09/05/2024 COT - RSPL - Yard Water Line Passed
10/21/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 10/21/24: All items noted on last inspection have been corrected. Okay to proceed with rough-in of M, P, AND E.
10/21/2024 COT - RSBU - Roof Nailing Passed 10/21/24: All items noted on last inspection have been corrected. Okay to proceed with rough-in of M, P, AND E.
11/13/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 11-13-24, approved.
11/13/2024 COT - RSEL - Grounding/Bonding Passed 11-13-24, approved
11/13/2024 COT - RSPL - Gas Pressure Test Passed 11-13-24, gas pressure test approved
11/15/2024 BULD - Electrical Clearance Passed 11-15-24, electrical panel approved for power.
11/15/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 11-15-24, items from previous inspection have been corrected. Intermediates approved-okay to continue with construction.
12/04/2024 COT - RSBU - Interior Shear Bracing Passed 12-4-24, approved. Okay to tape & texture drywall.
02/05/2025 COT - BULD - SWG Clearance Passed Passed CLEARANCE SWG 2/5/25
02/12/2025 COT - RSEL - Electrical Final Passed Passed final 2/12/25
02/12/2025 COT - RSEL - Outdoor Lighting Passed passed 2/12/25
02/12/2025 COT - RSME - Mechanical Final Passed passed 2/12/25
02/12/2025 COT - RSPL - Plumbing Final Passed Passed final 2/12/25
02/12/2025 ENGR Engineering Final Passed Site looks good.
02/12/2025 RSBU - Building Final Passed Passed final 2/12/25
02/12/2025 RSBU - Building Progress Passed passed 2/12/25

Documents

File Name Document Type  
F55I APPROVED TRUSS CALCS 7-29-22 - ALLIANCE TRUSS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-06-21_V1.PDF DOCUMENTS VIEW