Permit: TC-MDP-0524-00566
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
6124 E BLACK CAVIAR PL
Address NEW:
6124 E BLACK CAVIAR PL
Apply Date:
05/01/2024
Applicant:
Alonzo Martinez
Description:
Blackhawk H30A Model Plan
Permit Reviews
Permit Number - TC-MDP-0524-00566
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/02/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 05/13/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00566
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 05/01/2024 | Post-Tension Inspection Report is required. |
| 05/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 05/08/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 05/08/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 05/08/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0524-00566
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
| Date | Description | Comments |
|---|---|---|
| 05/14/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 05/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/08/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00566
Permite Description: Blackhawk H30A Model Plan
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/10/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 9.10.25 Garage must be on separate circuit |
| 09/10/2025 | RSBU - Building Final | N/A | Re-inspection required | 9.10.25 Garage must be on separate circuit |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00566
Permit Description: Blackhawk H30A Model Plan
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/16/2025 | COT - RSPL - Rough Soil | Passed | ||
| 05/16/2025 | COT - RSPL - Sewer | Passed | ||
| 05/16/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 05/28/2025 | BULD - Electrical Clearance | Passed | 5-28-25, panel okay to be energized. ECO clearance issued to TEP. | |
| 05/28/2025 | COT - RSEL - Electrical Underground | Passed | 5-29-25, electrical underground approved. | |
| 05/30/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 5-30-25: preslab, excavation/reinforcement/setbacks approved. Okay to pour concrete. | |
| 05/30/2025 | COT - RSBU - Preslab | Passed | 5-30-25: preslab, excavation/reinforcement/setbacks approved. Okay to pour concrete. | |
| 06/17/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 06/17/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/26/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 06/26/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 07/03/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made. 7/3/2025 | |
| 07/22/2025 | COT - RSBU - Interior Shear Bracing | Passed | 7-22-25: okay for tape & texture. | |
| 08/28/2025 | COT - BULD - SWG Clearance | Passed | 8.28.2025 Clearance for SW Gas. |
|
| 09/11/2025 | RSBU - Building Progress | Passed | ||
| 09/10/2025 | COT - RSEL - Outdoor Lighting | Passed | 9.10.25 APPROVED |
|
| 09/10/2025 | COT - RSME - Mechanical Final | Passed | 9.10.25 APPROVED |
|
| 09/10/2025 | COT - RSPL - Plumbing Final | Passed | 9.10.25 APPROVED |
|
| 09/15/2025 | ENGR Engineering Final | Passed | Site is clean and accessible; complete in accordance with approved plans. |