Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
6084 E BLACK CAVIAR PL
Apply Date:
05/01/2024
Applicant:
Helen Ormsby
Description:
Blackhawk H30M Model Plan (Model master plan TC-MDP-0823-01436)

Permit Reviews

Permit Number - TC-MDP-0524-00563
Permit Status: Inspections complete
Permit Description: Blackhawk H30M Model Plan (Model master plan TC-MDP-0823-01436)
Start Date Submittal Complete Date Status  
05/02/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 05/13/2024 APPROVED Review Details
10/08/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/09/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0524-00563
Permit Status: Inspections complete
Permit Description: Blackhawk H30M Model Plan (Model master plan TC-MDP-0823-01436)
Total Outstanding Activity Conditions - 1
Date Name
05/01/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0524-00563
Permit Status: Inspections complete
Permit Description: Blackhawk H30M Model Plan (Model master plan TC-MDP-0823-01436)
Date Description Comments
05/14/2024 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
05/08/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/08/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/01/2024 Post-Tension Inspection Report is required.
05/01/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/08/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/08/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00563
Permite Description: Blackhawk H30M Model Plan (Model master plan TC-MDP-0823-01436)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
09/16/2025 COT - RSBU - Roof Nailing N/A Re-inspection required 9.16.2025
Staples at shear wall throughout needs to be flush - see red markings. HTT4 or 5 not set in place at interior shear walls, add anchor bolts 12" from edge of sole, shear wall at south side requires anchor bolts or masa clips not per schedule, replace section of garage shear wall as marked. Next inspector needs to do full first & second floor walkthrough. STOPPED INSPECTION, MORE ITEMS COULD BE PRESENT.
09/16/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 9.16.2025
Staples at shear wall throughout needs to be flush - see red markings. HTT4 or 5 not set in place at interior shear walls, add anchor bolts 12" from edge of sole throughout, shear wall at south side requires anchor bolts or masa clips not per schedule, replace section of garage shear wall as marked. Next inspector needs to do full first & second floor walkthrough. STOPPED INSPECTION, MORE ITEMS COULD BE PRESENT.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00563
Permit Description: Blackhawk H30M Model Plan (Model master plan TC-MDP-0823-01436)
Total Completed Inspections - 21
Date Description Inspector Results Comments
08/28/2025 COT - RSPL - Rough Soil Passed 8.28.225
All corrections made from prior inspection on 8.26.2025. Okay to backfill with shading.
08/28/2025 COT - RSPL - Sewer Passed 8.28.225
All corrections made from prior inspection on 8.26.2025. Okay to backfill with shading.
08/28/2025 COT - RSPL - Yard Water Line Passed 8.28.225
All corrections made from prior inspection on 8.26.2025. Okay to backfill with shading.
09/04/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
09/04/2025 COT - RSBU - Preslab Passed 9.4.2025
Okay to proceed with concrete placement.
09/04/2025 BULD - Electrical Clearance Passed 9.4.2025
Clearance for TEP ECO.
09/04/2025 COT - RSEL - Electrical Underground Passed
09/04/2025 COT - RSEL - Grounding/Bonding Passed
09/17/2025 COT - RSBU - Roof Nailing Passed
09/26/2025 COT - RSPL - Gas Pressure Test Passed
09/30/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 9.30.29
Corrections made
09/30/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/09/2025 COT - RSBU - Interior Shear Bracing Passed 10.9.25
Approved, proceed
11/05/2025 COT - BULD - SWG Clearance Passed 11.05.2025
Clearance for Southwest Gas.
11/14/2025 COT - RSEL - Electrical Final Passed
11/14/2025 COT - RSEL - Outdoor Lighting Passed
11/14/2025 COT - RSME - Mechanical Final Passed
11/14/2025 COT - RSPL - Plumbing Final Passed
11/14/2025 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
11/14/2025 RSBU - Building Final Passed
11/14/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
BHK 145 SIC-2025-10-08_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 145 D1_V1.PDF DOCUMENTS VIEW
BHK 145 SIC-2024-05-01_V1.PDF DOCUMENTS VIEW