Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Sewer
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/26/2025 | COT - RSPL - Sewer | Re-inspection required | 8-26-25: the entire drain & waste system must be tested by mean of static water to 5' above the highest fittings. Remove rocks/debris from DWV/ Main water line trenches (see P2604.1 & P2604.3 of the 2018IRC for details)and install cap/proper fitting at copper hose bib. | |
| 08/28/2025 | COT - RSPL - Sewer | Passed | 8.28.225 All corrections made from prior inspection on 8.26.2025. Okay to backfill with shading. |