Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Roof NailingĀ 

Date Description Inspector Results Comments
09/16/2025 COT - RSBU - Roof NailingĀ  Re-inspection required 9.16.2025
Staples at shear wall throughout needs to be flush - see red markings. HTT4 or 5 not set in place at interior shear walls, add anchor bolts 12" from edge of sole, shear wall at south side requires anchor bolts or masa clips not per schedule, replace section of garage shear wall as marked. Next inspector needs to do full first & second floor walkthrough. STOPPED INSPECTION, MORE ITEMS COULD BE PRESENT.
09/17/2025 COT - RSBU - Roof NailingĀ  Passed