Permit: TC-MDP-0523-01101
Permit Details
Apply Date:
05/30/2023
Applicant:
HSLCS Permits
Description:
Building B three-story, 24 unit, apartment building model plans
Permit Reviews
Permit Number - TC-MDP-0523-01101
Permit Status: Complete
Permit Description: Building B three-story, 24 unit, apartment building model plans
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/22/2023 | COMMERCIAL REVIEW - FULL v.1 | 07/24/2023 | APPROVED |
07/05/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/08/2024 | REQUIRES RESUBMIT |
07/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 07/19/2024 | APPROVED |
07/22/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/24/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0523-01101
Permit Status: Complete
Permit Description: Building B three-story, 24 unit, apartment building model plans
Date | Description | Comments |
---|---|---|
04/21/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
04/21/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
07/24/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
04/21/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
04/21/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/30/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/21/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
07/18/2023 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01101
Permite Description: Building B three-story, 24 unit, apartment building model plans
Total Outstanding Inspections - 8
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/26/2023 | COT - LCBU - Exterior Clips/Sheathing | N/A | Partial Pass | 9/26/23: building #1, exterior & interior OSB shear, straps,holddowns approved for 1st level. |
02/13/2024 | COT - LCBU - Framing | N/A | Partial Pass | Floor decking for 3rd floor is properly nailed off. Okay to proceed with wall framing. 2/8/24: properly fasten holdowns throughout, king studs missing at openings greater than 4'1" throughout, third floor pending 2/9/24: not ready. Inspection will be rescheduled for Monday. 2/13/24: framing inspection complete in building 1. |
12/04/2023 | COT - LCPL - Plumbing Intermediate | N/A | Partial Pass | 12/4/23: 2 sets of roof drains. one on west half of building and another set on east half of building. Under test ok to proceed. |
07/25/2024 | COT - LCME - Mechanical Final | N/A | Partial Pass | Partial pass. 1st tower east of building #1. 7/25/2024 |
07/25/2024 | COT - LCPL - Plumbing Final | N/A | Partial Pass | Partial pass. 1st tower east of building #1. 7/25/2024 |
07/31/2024 | COT - LCEL - Electrical Final | N/A | Re-inspection required | Partial pass. 1st tower east of building #1. Unit 1205. Provide GFCI receptacle at kitchen counter right of stove. 7/25/2024 Partial pass. 2nd tower west of building #1. Approved. 7/26/2024 7/29/24: GFCI receptacle required for dishwasher. Unit 2101 exterior GFCI receptacle onside circuit as exterior lighting. 7/30/2024. Corrections were made. Tower 4 completed. North end of building 1. Pending roof inspection. 7/31/24: properly support refrigerant lines throughout roof, WR receptacles required at roof, refrigerant lines must be uv coated, ensure all dampers at dryer exhaust are functional, roof drains must properly drain away from footings. Refrigerant caps missing throughout at condenser units at roof. |
09/06/2023 | ENGR Engineering Final | N/A | Partial Pass | inform the contractor that the barrel cactuses that are not in the nursery needs to be planted in the nursery area. If we use any of those cactuses that there responsible for them |
09/03/2024 | TRSP - ROW - Final/Close-Out | N/A | Re-inspection required | Sidewalk still closed on North side |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01101
Permit Description: Building B three-story, 24 unit, apartment building model plans
Total Completed Inspections - 29
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/02/2023 | COT - LCPL - Rough Soil | Passed | 8/2/23: Building B, rough soil approved to cover with granular shade material. | |
08/14/2023 | COT - LCPL - Yard Water Line | Passed | 8/14/23: domestic water line tested at 60 psi hydro | |
08/23/2023 | COT - LCBU - Preslab | Passed | ||
08/23/2023 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
08/23/2023 | COT - LCEL - Electrical Underground | Passed | ||
08/23/2023 | COT - LCEL - Grounding/Bonding | Passed | ||
11/27/2023 | COT - LCBU - Roof Nailing | Passed | ||
01/30/2024 | COT - LCBU - Exterior Clips/Sheathing | Passed | ||
01/31/2024 | COT - LCPL - Sewer | Passed | 1/31/24: ok to backfill. Shading required. | |
02/16/2024 | COT - LCEL - Electrical Above Ceiling | Passed | ||
02/16/2024 | COT - LCME - Mechanical Above Ceiling | Passed | ||
02/16/2024 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
02/22/2024 | COT - LCBU - Building Above Ceiling | Passed | ||
02/26/2024 | COT - LCEL - Electrical Intermediate | Passed | ||
02/26/2024 | COT - LCBU - Framing | Passed | ||
02/26/2024 | COT - LCME - Mechanical Intermediate | Passed | ||
02/26/2024 | COT - LCPL - Plumbing Intermediate | Passed | ||
04/03/2024 | COT - HCBU - Interior Shear Bracing | Passed | ||
04/12/2024 | BULD - Electrical Clearance | Passed | 4/12/24: ECO Clearance for 7355 S WILMOT RD BLDG 1 SERVICE 1 SOUTH UNITS 1104,1204,1304,1103,1203,1303,1101,1201,1301,1102,1202,1302, HP. ECO Clearance for 7355 S WILMOT RD BLDG 1 SERVICE 2 NORTH UNITS 1106,1206,1208,1308,1205,1305,1108,1105,1307,1207,1107. |
|
07/15/2024 | COT - FCON - Fire - Final | Passed | ||
07/25/2024 | COT - BULD - SWG Clearance | Passed | ||
07/25/2024 | COT - LCPL - Gas Pressure Test | Passed | ||
07/29/2024 | COT - LCME - Mechanical Final | Passed | ||
07/29/2024 | COT - LCPL - Plumbing Final | Passed | ||
08/01/2024 | COT - LCEL - Electrical Final | Passed | ||
08/05/2024 | COT - LCEL - Outdoor Lighting | Passed | ||
08/27/2024 | COT - LCBU - Building Final | Passed | 8/27/2024. Okay for CofO. | |
08/26/2024 | ENGR Engineering Final | Passed | ||
09/06/2024 | TRSP - ROW - Final/Close-Out | Passed |