Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
05/30/2023
Applicant:
HSLCS Permits
Description:
Building B three-story, 24 unit, apartment building model plans

Permit Reviews

Permit Number - TC-MDP-0523-01101
Permit Status: Complete
Permit Description: Building B three-story, 24 unit, apartment building model plans
Start Date Submittal Complete Date Status  
06/22/2023 COMMERCIAL REVIEW - FULL v.1 07/24/2023 APPROVED Review Details
07/05/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/08/2024 REQUIRES RESUBMIT Review Details
07/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 07/19/2024 APPROVED Review Details
07/22/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/24/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0523-01101
Permit Status: Complete
Permit Description: Building B three-story, 24 unit, apartment building model plans
Date Description Comments
04/21/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
04/21/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
07/24/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
04/21/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
04/21/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/30/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/21/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
07/18/2023 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-01101
Permite Description: Building B three-story, 24 unit, apartment building model plans
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
09/26/2023 COT - LCBU - Exterior Clips/Sheathing N/A Partial Pass 9/26/23: building #1, exterior & interior OSB shear, straps,holddowns approved for 1st level.
02/13/2024 COT - LCBU - Framing N/A Partial Pass Floor decking for 3rd floor is properly nailed off. Okay to proceed with wall framing.
2/8/24: properly fasten holdowns throughout, king studs missing at openings greater than 4'1" throughout, third floor pending
2/9/24: not ready. Inspection will be rescheduled for Monday.
2/13/24: framing inspection complete in building 1.
12/04/2023 COT - LCPL - Plumbing Intermediate N/A Partial Pass 12/4/23: 2 sets of roof drains. one on west half of building and another set on east half of building. Under test ok to proceed.
07/25/2024 COT - LCME - Mechanical Final N/A Partial Pass Partial pass. 1st tower east of building #1. 7/25/2024
07/25/2024 COT - LCPL - Plumbing Final N/A Partial Pass Partial pass. 1st tower east of building #1.
7/25/2024
07/31/2024 COT - LCEL - Electrical Final N/A Re-inspection required Partial pass. 1st tower east of building #1. Unit 1205. Provide GFCI receptacle at kitchen counter right of stove.
7/25/2024

Partial pass. 2nd tower west of building #1. Approved. 7/26/2024

7/29/24: GFCI receptacle required for dishwasher. Unit 2101 exterior GFCI receptacle onside circuit as exterior lighting.

7/30/2024. Corrections were made. Tower 4 completed. North end of building 1. Pending roof inspection.
7/31/24: properly support refrigerant lines throughout roof, WR receptacles required at roof, refrigerant lines must be uv coated, ensure all dampers at dryer exhaust are functional, roof drains must properly drain away from footings. Refrigerant caps missing throughout at condenser units at roof.
09/06/2023 ENGR Engineering Final N/A Partial Pass inform the contractor that the barrel cactuses that are not in the nursery needs to be planted in the nursery area. If we use any of those cactuses that there responsible for them
09/03/2024 TRSP - ROW - Final/Close-Out N/A Re-inspection required Sidewalk still closed on North side

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-01101
Permit Description: Building B three-story, 24 unit, apartment building model plans
Total Completed Inspections - 29
Date Description Inspector Results Comments
08/02/2023 COT - LCPL - Rough Soil Passed 8/2/23: Building B, rough soil approved to cover with granular shade material.
08/14/2023 COT - LCPL - Yard Water Line Passed 8/14/23: domestic water line tested at 60 psi hydro
08/23/2023 COT - LCBU - Preslab Passed
08/23/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
08/23/2023 COT - LCEL - Electrical Underground Passed
08/23/2023 COT - LCEL - Grounding/Bonding Passed
11/27/2023 COT - LCBU - Roof Nailing Passed
01/30/2024 COT - LCBU - Exterior Clips/Sheathing Passed
01/31/2024 COT - LCPL - Sewer Passed 1/31/24: ok to backfill. Shading required.
02/16/2024 COT - LCEL - Electrical Above Ceiling Passed
02/16/2024 COT - LCME - Mechanical Above Ceiling Passed
02/16/2024 COT - LCPL - Plumbing Above Ceiling Passed
02/22/2024 COT - LCBU - Building Above Ceiling Passed
02/26/2024 COT - LCEL - Electrical Intermediate Passed
02/26/2024 COT - LCBU - Framing Passed
02/26/2024 COT - LCME - Mechanical Intermediate Passed
02/26/2024 COT - LCPL - Plumbing Intermediate Passed
04/03/2024 COT - HCBU - Interior Shear Bracing Passed
04/12/2024 BULD - Electrical Clearance Passed 4/12/24: ECO Clearance for 7355 S WILMOT RD BLDG 1 SERVICE 1 SOUTH UNITS 1104,1204,1304,1103,1203,1303,1101,1201,1301,1102,1202,1302, HP.

ECO Clearance for 7355 S WILMOT RD BLDG 1 SERVICE 2 NORTH UNITS
1106,1206,1208,1308,1205,1305,1108,1105,1307,1207,1107.
07/15/2024 COT - FCON - Fire - Final Passed
07/25/2024 COT - BULD - SWG Clearance Passed
07/25/2024 COT - LCPL - Gas Pressure Test Passed
07/29/2024 COT - LCME - Mechanical Final Passed
07/29/2024 COT - LCPL - Plumbing Final Passed
08/01/2024 COT - LCEL - Electrical Final Passed
08/05/2024 COT - LCEL - Outdoor Lighting Passed
08/27/2024 COT - LCBU - Building Final Passed 8/27/2024. Okay for CofO.
08/26/2024 ENGR Engineering Final Passed
09/06/2024 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
EES_071924_AIRBALANCE_CLORINIZATION_REPORTS_COMBINED_BLDG1-2024-07-19_V1.PDF DOCUMENTS VIEW
EES_240712_VERTICALFINAL_SIC_BLDG1-REPORTS-2024-07-12_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
EES_210223_GEOTECH_REPORT_V1.PDF DOCUMENTS VIEW
EES_230425_PRIVATE_SEWER_PLANS_APPROVED_V1.PDF DOCUMENTS VIEW
EES_230615_BUILDING 1_SIC-2023-06-16_V1.PDF DOCUMENTS VIEW
EES_230616_ SITE PLANS_V1.PDF DOCUMENTS VIEW
EES-FINAL PRIVATE WATER AND FIRE-LINES_3_7_23_1_V1.PDF DOCUMENTS VIEW