Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - LCBU - Framing
Permit Number - TC-MDP-0523-01101
Inspection Description - COT - LCBU - Framing
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/08/2024 | COT - LCBU - Framing | Re-inspection required | Floor decking for 3rd floor is properly nailed off. Okay to proceed with wall framing. 2/8/24: properly fasten holdowns throughout, king studs missing at openings greater than 4'1" throughout, third floor pending |
|
02/09/2024 | COT - LCBU - Framing | Not Ready | Floor decking for 3rd floor is properly nailed off. Okay to proceed with wall framing. 2/8/24: properly fasten holdowns throughout, king studs missing at openings greater than 4'1" throughout, third floor pending 2/9/24: not ready. Inspection will be rescheduled for Monday. |
|
02/13/2024 | COT - LCBU - Framing | Partial Pass | Floor decking for 3rd floor is properly nailed off. Okay to proceed with wall framing. 2/8/24: properly fasten holdowns throughout, king studs missing at openings greater than 4'1" throughout, third floor pending 2/9/24: not ready. Inspection will be rescheduled for Monday. 2/13/24: framing inspection complete in building 1. |
|
02/22/2024 | COT - LCBU - Framing | Partial Pass | 2/22/24 third and second floor framing final good to go. | |
02/26/2024 | COT - LCBU - Framing | Passed | ||
10/18/2023 | COT - LCBU - Framing | Partial Pass | Floor decking for 3rd floor is properly nailed off. Okay to proceed with wall framing. |