Inspection Status: Partial Pass

Inspection History: ENGR Engineering Final

Permit Number - TC-MDP-0523-01101

Inspection Description - ENGR Engineering Final

Inspection Status - Partial Pass

Date Description Inspector Results Comments
08/02/2024 ENGR Engineering Final Partial Pass Ok for a Level 4 Temporary Certificate of Occupancy for Building 1 and the Parking area, no other areas adjacent to this site at this time. All other buildings and parking areas
08/26/2024 ENGR Engineering Final Passed
09/06/2023 ENGR Engineering Final Partial Pass inform the contractor that the barrel cactuses that are not in the nursery needs to be planted in the nursery area. If we use any of those cactuses that there responsible for them