Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address:
9610 E MEOLA DR
Address NEW:
9610 E MEOLA DR
Apply Date:
03/16/2025
Applicant:
Celina Rodriguez
Description:
Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)

Permit Reviews

Permit Number - TC-MDP-0325-00187
Permit Status: Inspections complete
Permit Description: Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
Start Date Submittal Complete Date Status  
03/19/2026 SITE FROM MODEL PERMIT - SUBDIVISION v.2 03/31/2026 APPROVED Review Details
07/28/2026 SPECIAL INSPECTION REVIEW v.1 07/28/2026 APPROVED Review Details
03/04/2026 SITE FROM MODEL PERMIT - SUBDIVISION v.1 03/04/2026 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-0325-00187
Permit Status: Inspections complete
Permit Description: Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
Date Description Comments
03/20/2026 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/20/2026 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
03/20/2026 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/18/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/20/2026 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
03/18/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
03/18/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
03/20/2026 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0325-00187
Permite Description: Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
07/17/2026 COT - BULD - SWG Clearance N/A Not Applicable
07/28/2026 RSBU - Building Final N/A Partial Pass 07/28/2026
All corrections made to prior inspection. Partial pass pending open conditions paperwork.
07/28/2026 ENGR Engineering Final N/A Not Ready Site is complete. Unsatisfied Conditions, needs submittals and approvals before passing.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0325-00187
Permit Description: Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/03/2026 COT - RSPL - Yard Water Line Passed
04/03/2026 COT - RSPL - Sewer Passed
04/03/2026 COT - RSPL - Rough Soil Passed
04/16/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 04/16/2026
Approved per plan and reinforcement. Okay to pour.
04/16/2026 COT - RSBU - Preslab Passed 04/16/2026
Approved per plan and reinforcement. Okay to pour.
04/16/2026 COT - RSEL - Electrical Underground Passed
04/28/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 04/28/2026
Approved per plan.
04/28/2026 COT - RSBU - Roof Nailing Passed 04/28/2026
Approved per plan.
05/26/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/26/2026 COT - RSEL - Grounding/Bonding Passed
05/26/2026 COT - RSPL - Gas Pressure Test Passed
05/26/2026 COT - RSPL - Backwater Valve Passed
06/01/2026 BULD - Electrical Clearance Passed 6/1/26
TEP CLEARANCE: ECO
06/11/2026 COT - RSBU - Interior Shear Bracing Passed
07/27/2026 RSBU - Building Progress Passed
07/28/2026 COT - RSEL - Electrical Final Passed 07/28/2026
All corrections made to prior inspection. Partial pass pending open conditions paperwork.
07/28/2026 COT - RSEL - Outdoor Lighting Passed 07/28/2026
All corrections made to prior inspection. Partial pass pending open conditions paperwork.
07/28/2026 COT - RSME - Mechanical Final Passed 07/28/2026
All corrections made to prior inspection. Partial pass pending open conditions paperwork.
07/28/2026 COT - RSPL - Plumbing Final Passed 07/28/2026
All corrections made to prior inspection. Partial pass pending open conditions paperwork.
07/29/2026 RSBU - Building Final Passed
07/29/2026 ENGR Engineering Final Passed

Documents

File Name Document Type  
FINAL SIC - MIRADOR POINT PHASE 1 LOT 134-2026-07-21_V1.PDF DOCUMENTS VIEW
PT PACKET - MIRADOR POINT LOT 134-2026-07-28_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
MIRADOR POINT - LOT 134 START_V1.PDF DOCUMENTS VIEW
MP 134 SIC-2026-03-16_V1.PDF DOCUMENTS VIEW