Permit: TC-MDP-0325-00187
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9610 E MEOLA DR
Address NEW:
9610 E MEOLA DR
Apply Date:
03/16/2025
Applicant:
Celina Rodriguez
Description:
Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
Permit Reviews
Permit Number - TC-MDP-0325-00187
Permit Status: Inspections complete
Permit Description:
Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/19/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 03/31/2026 | APPROVED |
| 07/28/2026 | SPECIAL INSPECTION REVIEW v.1 | 07/28/2026 | APPROVED |
| 03/04/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 03/04/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0325-00187
Permit Status: Inspections complete
Permit Description:
Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
| Date | Description | Comments |
|---|---|---|
| 03/20/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 03/20/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 03/20/2026 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 03/18/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 03/20/2026 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 03/18/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 03/18/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 03/20/2026 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0325-00187
Permite Description:
Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 07/28/2026 | RSBU - Building Final | N/A | Partial Pass | 07/28/2026 All corrections made to prior inspection. Partial pass pending open conditions paperwork. |
| 07/28/2026 | ENGR Engineering Final | N/A | Not Ready | Site is complete. Unsatisfied Conditions, needs submittals and approvals before passing. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0325-00187
Permit Description:
Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2026 | COT - RSPL - Yard Water Line | Passed | ||
| 04/03/2026 | COT - RSPL - Sewer | Passed | ||
| 04/03/2026 | COT - RSPL - Rough Soil | Passed | ||
| 04/16/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 04/16/2026 Approved per plan and reinforcement. Okay to pour. |
|
| 04/16/2026 | COT - RSBU - Preslab | Passed | 04/16/2026 Approved per plan and reinforcement. Okay to pour. |
|
| 04/16/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 04/28/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 04/28/2026 Approved per plan. |
|
| 04/28/2026 | COT - RSBU - Roof Nailing | Passed | 04/28/2026 Approved per plan. |
|
| 05/26/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 05/26/2026 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/26/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 05/26/2026 | COT - RSPL - Backwater Valve | Passed | ||
| 06/01/2026 | BULD - Electrical Clearance | Passed | 6/1/26 TEP CLEARANCE: ECO |
|
| 06/11/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 07/27/2026 | RSBU - Building Progress | Passed | ||
| 07/28/2026 | COT - RSEL - Electrical Final | Passed | 07/28/2026 All corrections made to prior inspection. Partial pass pending open conditions paperwork. |
|
| 07/28/2026 | COT - RSEL - Outdoor Lighting | Passed | 07/28/2026 All corrections made to prior inspection. Partial pass pending open conditions paperwork. |
|
| 07/28/2026 | COT - RSME - Mechanical Final | Passed | 07/28/2026 All corrections made to prior inspection. Partial pass pending open conditions paperwork. |
|
| 07/28/2026 | COT - RSPL - Plumbing Final | Passed | 07/28/2026 All corrections made to prior inspection. Partial pass pending open conditions paperwork. |
|
| 07/29/2026 | RSBU - Building Final | Passed | ||
| 07/29/2026 | ENGR Engineering Final | Passed |