Inspection History Details
Inspection Status: Passed
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/29/2026 | RSBU - Building Final | Passed | ||
| 07/27/2026 | RSBU - Building Final | Not Ready | Outdoor lighting missing fixture. Provide grommet along with ground screw at metal box. Properly secure switch underneath kitchen sink. T stat she’ll be at 48”. Smoke detectors to close to the wall both north bedrooms. Provide proper slope at drain pan. Label heat kit if installed. Or none if not. Remove all construction debris. Extend primary condensation line. Provide 3” clearance around a/c unit. Ensure all conditions are met prior to final. 7/27/2026 | |
| 07/28/2026 | RSBU - Building Final | Partial Pass | 07/28/2026 All corrections made to prior inspection. Partial pass pending open conditions paperwork. |