Permit: TC-MDP-0324-00297
Permit Details
Apply Date:
03/08/2024
Applicant:
Cindy Nemo
Description:
Blackhawk - T698 - Layla
Permit Reviews
Permit Number - TC-MDP-0324-00297
Permit Status: Inspections complete
Permit Description: Blackhawk - T698 - Layla
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/11/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 03/21/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0324-00297
Permit Status: Inspections complete
Permit Description: Blackhawk - T698 - Layla
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
03/08/2024 | Post-Tension Inspection Report is required. |
03/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
03/21/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
03/21/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
03/21/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0324-00297
Permit Status: Inspections complete
Permit Description: Blackhawk - T698 - Layla
Date | Description | Comments |
---|---|---|
03/21/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
03/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
03/21/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0324-00297
Permite Description: Blackhawk - T698 - Layla
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/03/2024 | BULD - Electrical Clearance | N/A | Re-inspection required | 10/3/24: Thermostat shall be no higher than 54" above finish grade, strap required at living room GLB, pex requires 12" clearance from can light, kitchen hood duct must be properly installed in wall, block registers on three sides at entrance, secure NM cable. 12" from fixture, seal penetrations at vapor barrier. Properly secure Ufer ground |
10/03/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 10/3/24: Thermostat shall be no higher than 54" above finish grade, strap required at living room GLB, pex requires 12" clearance from can light, kitchen hood duct must be properly installed in wall, block registers on three sides at entrance, secure NM cable. 12" from fixture, seal penetrations at vapor barrier. |
12/20/2024 | COT - RSME - Mechanical Final | N/A | Re-inspection required | Refrigerator not installed, roof shingles over front patio not installed. Re inspection required. |
12/20/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 12/20/24 sewer is being worked on. Not ready. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0324-00297
Permit Description: Blackhawk - T698 - Layla
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/07/2024 | COT - RSPL - Rough Soil | Passed | ||
06/07/2024 | COT - RSPL - Sewer | Passed | ||
06/07/2024 | COT - RSPL - Yard Water Line | Passed | ||
07/19/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
07/19/2024 | COT - RSBU - Preslab | Passed | ||
07/19/2024 | COT - RSEL - Electrical Underground | Passed | ||
08/14/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 8/14/2024 corrections were made. | |
08/14/2024 | COT - RSBU - Roof Nailing | Passed | 8/14/2024 corrections were made. | |
10/03/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
10/07/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
10/07/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 10/7/2024 | |
10/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10/15/24 corrections made | |
10/30/2024 | COT - RSBU - Interior Shear Bracing | Passed | 10-30-24, interior shear wall inspection approved. Okay to tape and texture drywall. | |
11/26/2024 | RSBU - Building Progress | Passed | 11-26-24, okay to pour entryway | |
12/18/2024 | COT - BULD - SWG Clearance | Passed | Passed SWG CLEARANCE 12/18/24 | |
12/18/2024 | ENGR Engineering Final | Passed | CO Ready | |
12/20/2024 | COT - RSEL - Electrical Final | Passed | 12/20'24 pass | |
12/20/2024 | COT - RSEL - Outdoor Lighting | Passed | 12/20/24 pass | |
12/27/2024 | COT - RSME - Mechanical Final | Passed | 12/27/24 passed final | |
12/27/2024 | COT - RSPL - Plumbing Final | Passed | 12/27/24 passed final | |
12/27/2024 | RSBU - Building Final | Passed | 12/27/24 passed final |