Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
5978 S STEWART BL
Apply Date:
03/06/2025
Applicant:
Ramon VALDEZ
Description:
DUPLEX SFR & ADU (Model master plan TC-MDP-1224-01416)

Permit Reviews

Permit Number - TC-MDP-0125-00041
Permit Status: Complete
Permit Description: DUPLEX SFR & ADU (Model master plan TC-MDP-1224-01416)
Start Date Submittal Complete Date Status  
03/27/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 04/23/2025 APPROVED Review Details
04/23/2025 RESTAMP - RESIDENTIAL v.1 04/23/2025 APPROVED Review Details
03/10/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 03/24/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-0125-00041
Permit Status: Complete
Permit Description: DUPLEX SFR & ADU (Model master plan TC-MDP-1224-01416)
Date Description Comments
03/10/2025 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
03/27/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/28/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0125-00041
Permite Description: DUPLEX SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
09/26/2025 COT - RSBU - Interior Shear Bracing N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0125-00041
Permit Description: DUPLEX SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Completed Inspections - 18
Date Description Inspector Results Comments
05/09/2025 COT - RSPL - Sewer Passed 5-9-25, sewer connection approved. Okay to backfill-shading required.
05/14/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 5/14/25
Pass
05/14/2025 COT - RSBU - Preslab Passed
06/16/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
06/16/2025 COT - RSBU - Roof Nailing Passed
06/16/2025 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
06/20/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/20/2025 COT - RSEL - Grounding/Bonding Passed
06/20/2025 COT - RSPL - Rough Soil Passed
07/21/2025 BULD - Electrical Clearance Passed Approved 400A dual-meter service panel (200A each) - ECO Clearance to TEP is required for unit #1 and unit #2
07/21/2025 COT - RSPL - Yard Water Line Passed #1 and #2
09/26/2025 COT - RSEL - Electrical Underground Passed
09/26/2025 COT - RSEL - Outdoor Lighting Passed
10/06/2025 COT - RSEL - Electrical Final Passed
10/06/2025 COT - RSME - Mechanical Final Passed
10/06/2025 COT - RSPL - Plumbing Final Passed
10/06/2025 ENGR Engineering Final Passed 10/6/25 - Site in complete in accordance with approved plans and City ordinances.
10/06/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
5978 RESPONSE LETTER_V1.PDF DOCUMENTS VIEW
CONS-5978 V2_V2.PDF DOCUMENTS VIEW