Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
Permit Number - TC-MDP-0125-00041
Inspection Description - BULD - Electrical Clearance
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/18/2025 | BULD - Electrical Clearance | Re-inspection required | 5-9-25, partial pass- gray water not installed due to elevation requirements. Gray water will be verified at intermediates and underground plumbing is okay to backfill-shading required. 6/18/25: Dryer duct must be sealed at all joints, all penetrations shall be sealed through top plate and vapor barrier, flex duct supports required throughout, plumbing lines not complete, DWV not under test, tub not under test, nail plates required where plumbing/mechanical/electrical come within 1 1/4" of face of 2x. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. ONLY WALKED WEST UNIT DUE TO WORKERS STILL ROUGHING-IN PLUMBING LINES. |
|
| 07/21/2025 | BULD - Electrical Clearance | Passed | Approved 400A dual-meter service panel (200A each) - ECO Clearance to TEP is required for unit #1 and unit #2 |