Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - RSPL - Rough Soil
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2025 | COT - RSPL - Rough Soil | Partial Pass | 5-9-25, partial pass- gray water not installed due to elevation requirements. Gray water will be verified at intermediates and underground plumbing is okay to backfill-shading required. | |
| 06/18/2025 | COT - RSPL - Rough Soil | Re-inspection required | 5-9-25, partial pass- gray water not installed due to elevation requirements. Gray water will be verified at intermediates and underground plumbing is okay to backfill-shading required. 6/18/25: Dryer duct must be sealed at all joints, all penetrations shall be sealed through top plate and vapor barrier, flex duct supports required throughout, plumbing lines not complete, DWV not under test, tub not under test, nail plates required where plumbing/mechanical/electrical come within 1 1/4" of face of 2x. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. ONLY WALKED WEST UNIT DUE TO WORKERS STILL ROUGHING-IN PLUMBING LINES. |
|
| 06/20/2025 | COT - RSPL - Rough Soil | Passed |