Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
1863 W AJO WY
Address NEW:
1863 W AJO WY
Apply Date:
01/30/2025
Applicant:
Ramon VALDEZ
Description:
4bd 2ba SFR (Model master plan TC-MDP-0125-00016)

Permit Reviews

Permit Number - TC-MDP-0125-00038
Permit Status: Complete
Permit Description: 4bd 2ba SFR (Model master plan TC-MDP-0125-00016)
Start Date Submittal Complete Date Status  
01/31/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 02/18/2025 APPROVED Review Details
02/18/2025 RESTAMP - RESIDENTIAL v.1 02/20/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0125-00038
Permit Status: Complete
Permit Description: 4bd 2ba SFR (Model master plan TC-MDP-0125-00016)
Date Description Comments
01/28/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/28/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0125-00038
Permite Description: 4bd 2ba SFR (Model master plan TC-MDP-0125-00016)
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
03/10/2025 COT - RSBU - Excavation/Rebar/Zoning N/A Re-inspection required 3/10/25: footers not per plan (detail B1), footers not at proper depth, reinforcement requires 3" clearance from earth, post footings not per plan, reinforcement overlap requires 24" min, gray water must terminate 24" above finish grade.
03/10/2025 COT - RSBU - Preslab N/A Re-inspection required 3/10/25: footers not per plan (detail B1), footers not at proper depth, reinforcement requires 3" clearance from earth, post footings not per plan, reinforcement overlap requires 24" min, gray water must terminate 24" above finish grade.
03/10/2025 COT - RSEL - Grounding/Bonding N/A Re-inspection required 3/10/25: footers not per plan (detail B1), footers not at proper depth, reinforcement requires 3" clearance from earth, post footings not per plan, reinforcement overlap requires 24" min, gray water must terminate 24" above finish grade.
04/01/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Not Ready 4-1-25, not ready.
04/01/2025 COT - RSBU - Roof Nailing N/A Not Ready 4-1-25, not ready.
06/13/2025 COT - RSBU - Interior Shear Bracing N/A Not Applicable
06/13/2025 COT - RSEL - Electrical Underground N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0125-00038
Permit Description: 4bd 2ba SFR (Model master plan TC-MDP-0125-00016)
Total Completed Inspections - 16
Date Description Inspector Results Comments
03/07/2025 COT - RSPL - Rough Soil Passed 3/7/25: plumbing underground per plans ok to proceed with backfill. Shading required
03/12/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 3/12/25 corrections made
03/12/2025 COT - RSBU - Preslab Passed 3/12/25 corrections made
03/12/2025 COT - RSEL - Grounding/Bonding Passed 3/12/25 corrections made
04/14/2025 COT - RSPL - Sewer Passed 4-14-25, sewer connection approved. Okay to backfill with shading materials.
04/21/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Approved. 4/21/2025
04/21/2025 COT - RSBU - Roof Nailing Passed Approved. 4/21/2025
04/25/2025 BULD - Electrical Clearance Passed 4/24/25:Properly seal all penetrations through vapor barrier and top plate, 3” ABS for future solar missing at water heater, truss gusset plates missing/damaged in garage, EV receptacle missing in garage, framing not per plan, smoke alarm missing outside of bedroom 4, FHA plate required at kitchen exhaust duct, seal pipes in slab at kitchen, Bedroom 1 is calling for 12/2 wire for receptacles (revise plan), missing circuits at panel (not per plan), support flex at bedroom 1 and bathroom, blocking required on 4-gang boxes, Attic access requires 30” of head room clearance( flex running through attic access), condensate drain must be secured, nail plate required in north bathroom, A/C register missing at entry, Attic vent missing, lath incomplete.
4/25/25: TEP ECO CLEARANCE OK TO ENERGIZE.
04/25/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/13/2025 COT - RSEL - Electrical Final Passed
06/13/2025 COT - RSEL - Outdoor Lighting Passed
06/13/2025 COT - RSME - Mechanical Final Passed
06/13/2025 COT - RSPL - Plumbing Final Passed
06/13/2025 COT - RSPL - Yard Water Line Passed
06/13/2025 RSBU - Building Final Passed
06/16/2025 ENGR Engineering Final Passed Concrete driveway apron added per plans. Site is in accordance with approved plans. CofO ready.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-1863 AJO_V1_V2.PDF DOCUMENTS VIEW