Permit: TC-MDP-0125-00038
Permit Details
Apply Date:
01/30/2025
Applicant:
Ramon VALDEZ
Description:
4bd 2ba SFR (Model master plan TC-MDP-0125-00016)
Permit Reviews
Permit Number - TC-MDP-0125-00038
Permit Status: Complete
Permit Description: 4bd 2ba SFR (Model master plan TC-MDP-0125-00016)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/31/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 02/18/2025 | APPROVED |
| 02/18/2025 | RESTAMP - RESIDENTIAL v.1 | 02/20/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0125-00038
Permit Status: Complete
Permit Description: 4bd 2ba SFR (Model master plan TC-MDP-0125-00016)
| Date | Description | Comments |
|---|---|---|
| 01/28/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 01/28/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0125-00038
Permite Description: 4bd 2ba SFR (Model master plan TC-MDP-0125-00016)
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/10/2025 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | 3/10/25: footers not per plan (detail B1), footers not at proper depth, reinforcement requires 3" clearance from earth, post footings not per plan, reinforcement overlap requires 24" min, gray water must terminate 24" above finish grade. |
| 03/10/2025 | COT - RSBU - Preslab | N/A | Re-inspection required | 3/10/25: footers not per plan (detail B1), footers not at proper depth, reinforcement requires 3" clearance from earth, post footings not per plan, reinforcement overlap requires 24" min, gray water must terminate 24" above finish grade. |
| 03/10/2025 | COT - RSEL - Grounding/Bonding | N/A | Re-inspection required | 3/10/25: footers not per plan (detail B1), footers not at proper depth, reinforcement requires 3" clearance from earth, post footings not per plan, reinforcement overlap requires 24" min, gray water must terminate 24" above finish grade. |
| 04/01/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Not Ready | 4-1-25, not ready. |
| 04/01/2025 | COT - RSBU - Roof Nailing | N/A | Not Ready | 4-1-25, not ready. |
| 06/13/2025 | COT - RSBU - Interior Shear Bracing | N/A | Not Applicable | |
| 06/13/2025 | COT - RSEL - Electrical Underground | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0125-00038
Permit Description: 4bd 2ba SFR (Model master plan TC-MDP-0125-00016)
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2025 | COT - RSPL - Rough Soil | Passed | 3/7/25: plumbing underground per plans ok to proceed with backfill. Shading required | |
| 03/12/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 3/12/25 corrections made | |
| 03/12/2025 | COT - RSBU - Preslab | Passed | 3/12/25 corrections made | |
| 03/12/2025 | COT - RSEL - Grounding/Bonding | Passed | 3/12/25 corrections made | |
| 04/14/2025 | COT - RSPL - Sewer | Passed | 4-14-25, sewer connection approved. Okay to backfill with shading materials. | |
| 04/21/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Approved. 4/21/2025 | |
| 04/21/2025 | COT - RSBU - Roof Nailing | Passed | Approved. 4/21/2025 | |
| 04/25/2025 | BULD - Electrical Clearance | Passed | 4/24/25:Properly seal all penetrations through vapor barrier and top plate, 3” ABS for future solar missing at water heater, truss gusset plates missing/damaged in garage, EV receptacle missing in garage, framing not per plan, smoke alarm missing outside of bedroom 4, FHA plate required at kitchen exhaust duct, seal pipes in slab at kitchen, Bedroom 1 is calling for 12/2 wire for receptacles (revise plan), missing circuits at panel (not per plan), support flex at bedroom 1 and bathroom, blocking required on 4-gang boxes, Attic access requires 30” of head room clearance( flex running through attic access), condensate drain must be secured, nail plate required in north bathroom, A/C register missing at entry, Attic vent missing, lath incomplete. 4/25/25: TEP ECO CLEARANCE OK TO ENERGIZE. |
|
| 04/25/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/13/2025 | COT - RSEL - Electrical Final | Passed | ||
| 06/13/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/13/2025 | COT - RSME - Mechanical Final | Passed | ||
| 06/13/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 06/13/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 06/13/2025 | RSBU - Building Final | Passed | ||
| 06/16/2025 | ENGR Engineering Final | Passed | Concrete driveway apron added per plans. Site is in accordance with approved plans. CofO ready. |