Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/24/2025 | BULD - Electrical Clearance | Re-inspection required | 4/24/25:Properly seal all penetrations through vapor barrier and top plate, 3” ABS for future solar missing at water heater, truss gusset plates missing/damaged in garage, EV receptacle missing in garage, framing not per plan, smoke alarm missing outside of bedroom 4, FHA plate required at kitchen exhaust duct, seal pipes in slab at kitchen, Bedroom 1 is calling for 12/2 wire for receptacles (revise plan), missing circuits at panel (not per plan), support flex at bedroom 1 and bathroom, blocking required on 4-gang boxes, Attic access requires 30” of head room clearance( flex running through attic access), condensate drain must be secured, nail plate required in north bathroom, A/C register missing at entry, Attic vent missing, lath incomplete. | |
| 04/25/2025 | BULD - Electrical Clearance | Passed | 4/24/25:Properly seal all penetrations through vapor barrier and top plate, 3” ABS for future solar missing at water heater, truss gusset plates missing/damaged in garage, EV receptacle missing in garage, framing not per plan, smoke alarm missing outside of bedroom 4, FHA plate required at kitchen exhaust duct, seal pipes in slab at kitchen, Bedroom 1 is calling for 12/2 wire for receptacles (revise plan), missing circuits at panel (not per plan), support flex at bedroom 1 and bathroom, blocking required on 4-gang boxes, Attic access requires 30” of head room clearance( flex running through attic access), condensate drain must be secured, nail plate required in north bathroom, A/C register missing at entry, Attic vent missing, lath incomplete. 4/25/25: TEP ECO CLEARANCE OK TO ENERGIZE. |