Permit: TC-MDP-0124-00079
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
6139 E CAMPOLINA TR
Address NEW:
6139 E CAMPOLINA TR
Apply Date:
01/16/2024
Applicant:
Helen Ormsby
Description:
Blackhawk H30D Model Plan
Permit Reviews
Permit Number - TC-MDP-0124-00079
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/17/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 01/23/2024 | APPROVED |
| 07/21/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/22/2026 | APPROVED |
| 08/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/28/2025 | APPROVED |
| 04/20/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/20/2026 | APPROVED |
| 02/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/29/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0124-00079
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
| Date | Description | Comments |
|---|---|---|
| 01/18/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 01/18/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 02/29/2024 | Post-Tension Inspection Report is required. | |
| 10/03/2023 | Post-Tension Inspection Report is required. | |
| 08/23/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 11/07/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 11/07/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 02/29/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 09/07/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00079
Permite Description: Blackhawk H30D Model Plan
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/15/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 04/15/2026 DWV not holding under water test, add nail plates for electrical lines notched within 1.25" to stud face, add fire foam to penetrated top plate in bedroom as marked. |
| 05/08/2026 | COT - RSBU - Interior Shear Bracing | N/A | Not Ready | 05/08/2026 Not ready, trades still working. |
| 07/07/2026 | ENGR Engineering Final | N/A | Not Ready | Gray water connection caps are too high- creating tripping hazard in side yard. Trim them down so that they are about an 1” or so above finish grade. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0124-00079
Permit Description: Blackhawk H30D Model Plan
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/20/2026 | COT - RSPL - Rough Soil | Passed | 2.20.26 Approved |
|
| 02/20/2026 | COT - RSPL - Sewer | Passed | 2.20.26 Approved |
|
| 02/20/2026 | COT - RSPL - Yard Water Line | Passed | 2.20.26 Approved |
|
| 02/26/2026 | COT - RSBU - Preslab | Passed | Passed 2/26/26 | |
| 02/26/2026 | BULD - Electrical Clearance | Passed | Passed 2/26/26 CLEARANCE ECO | |
| 02/26/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 2/26/26 | |
| 02/26/2026 | COT - RSEL - Electrical Underground | Passed | Passed 2/26/26 | |
| 02/26/2026 | COT - RSEL - Grounding/Bonding | Passed | Passed 2/26/26 | |
| 04/01/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 4.1.26 Corrections made Proceed |
|
| 04/01/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 04/15/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 04/16/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 04/16/2026 Corrections made to prior inspection. |
|
| 04/16/2026 | RSBU - Building Progress | Passed | ||
| 05/11/2026 | COT - RSBU - Interior Shear Bracing | Passed | 5.11.26 Approved |
|
| 06/11/2026 | COT - BULD - SWG Clearance | Passed | ||
| 07/06/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/29/2026 | RSBU - Building Final | Passed | 07/29/2026 All corrections made. Conditions satisfied as well. |
|
| 07/29/2026 | COT - RSME - Mechanical Final | Passed | 07/29/2026 All corrections made. Conditions satisfied as well. |
|
| 07/29/2026 | COT - RSPL - Plumbing Final | Passed | 07/29/2026 All corrections made. Conditions satisfied as well. |
|
| 07/29/2026 | COT - RSEL - Electrical Final | Passed | 07/29/2026 All corrections made. Conditions satisfied as well. |
|
| 07/29/2026 | ENGR Engineering Final | Passed |