Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
01/15/2024
Applicant:
Lisa Bowers
Description:
ADU Model Plan Lumen

Permit Reviews

Permit Number - TC-MDP-0124-00054
Permit Status: Complete
Permit Description: ADU Model Plan Lumen
Start Date Submittal Complete Date Status  
02/12/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 02/27/2024 REQUIRES RESUBMIT Review Details
03/08/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 03/22/2024 APPROVED Review Details
01/16/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 01/16/2024 REQUIRES RESUBMIT Review Details
04/15/2025 MODEL PERMIT TEMPLATE REVIEW RESIDENTIAL v.2 04/15/2025 APPROVED Review Details
11/01/2024 MODEL PERMIT TEMPLATE REVIEW RESIDENTIAL v.1 11/01/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-0124-00054
Permit Status: Complete
Permit Description: ADU Model Plan Lumen
Date Description Comments
03/22/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
03/22/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0124-00054
Permite Description: ADU Model Plan Lumen
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
10/01/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Partial Pass Electric and plumbing are Ok; need mechanical to be installed.
01/02/2025 BULD - Electrical Clearance N/A Re-inspection required 01/02/25
Need address label properly labeled to distinguish between units 1 and 2.
Terminate wires at the meter.
Secure ground wire at the main panel.
05/24/2024 COT - BULD - SWG Clearance N/A Not Ready 5/24/24: called Robert at (520)449-6649 no answer. Arrived on site no approved plans.
08/13/2024 COT - RSBU - Interior Shear Bracing N/A Not Ready needed framing inspection

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0124-00054
Permit Description: ADU Model Plan Lumen
Total Completed Inspections - 20
Date Description Inspector Results Comments
05/28/2024 COT - RSPL - Rough Soil Passed 5/28/24: plumbing underground per plans ok to proceed.
06/14/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
06/14/2024 COT - RSBU - Preslab Passed
06/14/2024 COT - RSEL - Grounding/Bonding Passed
08/19/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
11/06/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Corrections were made. Approved. 11/6/2024
12/27/2024 COT - RSEL - Electrical Underground Passed 12-27-24, electrical underground conduit verified as per plans and is okay to backfill trench.
01/03/2025 BULD - Electrical Clearance Passed O1/03/25
Passed.
TEP CLEARANCE: ECO unit2
03/20/2025 COT - RSBU - Roof Nailing Passed
03/20/2025 RSBU - Building Progress Passed
03/20/2025 COT - RSPL - Gas Pressure Test Passed
03/20/2025 COT - RSPL - Yard Water Line Passed
03/20/2025 COT - RSPL - Sewer Passed
04/08/2025 ENGR Engineering Final Passed CO READY
04/10/2025 COT - RSBU - Interior Shear Bracing Passed
04/10/2025 COT - RSEL - Electrical Final Passed
04/10/2025 COT - RSEL - Outdoor Lighting Passed
04/10/2025 COT - RSME - Mechanical Final Passed
04/10/2025 COT - RSPL - Plumbing Final Passed
04/10/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
2024 PALMDALE- ELECT. REV 1_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
OBA 313 W PALMDALE_V1.PDF DOCUMENTS VIEW
240307_PALMDALEADU_PERMITREVIEW_V2.PDF DOCUMENTS VIEW