Permit Review Detail
Review Status: Requires Resubmit
Review Details: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2
Permit Number - TC-MDP-0124-00054
Review Name: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/27/2024 | Site Engineering | APPROVED | |||
| 02/14/2024 | Fire New Construction | NOT REQUIRED | |||
| 02/27/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 02/20/2024 | Residential Building | REQUIRES RESUBMIT | Permit Review TC-MDP-0124-00054 (313 W PALMDALE ST TUCSON, AZ 85714) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Residential Code (IRC). 1. Provide elevation measurements for Next Upstream Manhole and Finished Floor Elevation. Provide Backwater valve protection as/if required. Backwater valve protection: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/building-code/2018_-_irc_amendments.pdf Section P3008.1 2. Show the size of the existing building sewer line and show the size is compliant with, see Table P3005.4.2. 3. Tucson Water Department limits 5/8" water meters to a maximum of 11 IRC fixture units or 15 gallons per minute. Show a ¾" water meter upgrade. 4. Provide a complete fixture unit schedule, P2903.6. Provide the water pipe diameter between the meter and shut off valve in compliance with P2903.7. A minimum 1” service pipe is required for supplying water to more than 9.5 fixture units. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 02/27/2024 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Nathan Herrera Planner PROJECT: TC-MDP-0124-00054 Address: 313 W Palmdale St. Tucson, AZ. 85714 Parcel: 120-07-1750 Zoning: R-2 Existing Use: Single Family Residence Project Description: 2nd Unit Addition TRANSMITTAL DATE: 2/27/2024 This site is located in the R-2 zone (UDC 4.7.8). A single-family residence is a permitted use in this zone (Table 4.8-2) subject to Use Specific Standards 4.9.7.B.6, .9 & .10 1. COMMENT: Per UDC Article 6.4.4.A, height is the vertical distance measured from design grade. Clarify if the height shown on the site plan is from design grade of Finish Floor Elevation. COMMENT: Per UDC Article 6.3-2.A, the required setback in the R-2 zone is the greater of 6 feet or 2/3 the height of the proposed building wall. If the height provided is from Finish Floor Elevation and not design grade the proposed locations on the second unit may not be meeting setback requirements. 2. COMMENT: Provide the property dimensions on the site plan, as found on the Residential Plot Plan requirements found at: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/residential_plot_plan_requirements.pdf COMMENT: Provide a measurement from the half right-of-way on Palmdale to the property boundary (30 feet), and a measurement from the back of curb on Palmdale to the property boundary (12 feet). As shown on the Residential Plot Plan example above. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: revised residential building permit along with a detailed response letter, which states how all Zoning Review Section comments were addressed. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home. Instructions for resubmittal - https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf If you have any questions about this transmittal, please contact Nathan Herrera at Nathan.Herrera@TucsonAZ.gov or at 520-837-4894 |
||
| 02/12/2024 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 02/13/2024 | ROW Engineering Review | REVIEW COMPLETED | No comments |