Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/09/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Not Ready | 8/9/24: No plans on site. Please reschedule the inspection. | |
| COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Re-inspection required | 8/13/24: follow header schedule interior at windows and closet framing. | ||
| 08/15/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Re-inspection required | 8/9/24: No plans on site. Please reschedule the inspection. 8/13/24: follow header schedule interior at windows and closet framing. 8/15/24: trimmer studs at headers must be continuous and make full contact with header, window sills should beg at 44" max (do not meet egress requirements), Simpson H2.5 missing at headers (per plan), interior bearing headers not per plan, fire blocking around soffits required. |
|
| 08/19/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed |