Permit: TC-COM-1224-02304
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
317 W 23RD ST BLDG 5
Address NEW:
317 W 23RD ST BLDG 5
Apply Date:
12/05/2024
Applicant:
Kelly Rehm
Description:
Church Photovoltaic system addition, 60 new 520W modules (31.2kW DC) on a new steel structure. add to exist PV system of 69 460W modules for a combined DC system size of 61.7kW and 63.3kW AC. interconnected through one existing TEP service.
Permit Reviews
Permit Number - TC-COM-1224-02304
Permit Status: Complete
Permit Description: Church Photovoltaic system addition, 60 new 520W modules (31.2kW DC) on a new steel structure. add to exist PV system of 69 460W modules for a combined DC system size of 61.7kW and 63.3kW AC. interconnected through one existing TEP service.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/15/2025 | COMMERCIAL REVIEW - FULL v.2 | 01/29/2025 | APPROVED |
| 03/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/25/2025 | REQUIRES RESUBMIT |
| 03/26/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/26/2025 | APPROVED |
| 12/06/2024 | COMMERCIAL REVIEW - FULL v.1 | 12/31/2024 | REQUIRES RESUBMIT |
| 01/29/2025 | RESTAMP - COMMERCIAL v.1 | 01/30/2025 | APPROVED |
Conditions
Permit Number - TC-COM-1224-02304
Permit Status: Complete
Permit Description: Church Photovoltaic system addition, 60 new 520W modules (31.2kW DC) on a new steel structure. add to exist PV system of 69 460W modules for a combined DC system size of 61.7kW and 63.3kW AC. interconnected through one existing TEP service.
| Date | Description | Comments |
|---|---|---|
| 12/20/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 12/20/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
| 12/20/2024 | SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. | |
| 12/20/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 12/20/2024 | SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED. | |
| 12/20/2024 | SPECIAL INSPECTION OF FABRICATION OF STRUCTURAL STEEL BEING PERFORMED ON THE PREMISES OF A FABRICATOR'S SHOP IS REQUIRED. EXCEPTION: SPECIAL INSPECTIONS OF FABRICATORS WITH ONE OF THE FOLLOWING QUALIFICATIONS IS NOT REQUIRED: • INTERNATIONAL ACCREDITATION SERVICE, INC. (IAS) APPROVED FABRICATOR. • AISC CERTIFIED FABRICATOR (STD). THE SPECIAL INSPECTOR SHALL VERIFY THAT THE FABRICATOR MAINTAINS DETAILED FABRICATION AND QUALITY CONTROL PROCEDURES THAT PROVIDE A BASIS FOR INSPECTION CONTROL OF THE WORKMANSHIP AND THE FABRICATOR’S ABILITY TO CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND REFERENCED STANDARDS. THE SPECIAL INSPECTOR SHALL REVIEW THE PROCEDURES FOR COMPLETENESS AND ADEQUACY RELATIVE TO THE CODE REQUIREMENTS FOR THE FABRICATOR’S SCOPE OF WORK. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1224-02304
Permite Description: Church Photovoltaic system addition, 60 new 520W modules (31.2kW DC) on a new steel structure. add to exist PV system of 69 460W modules for a combined DC system size of 61.7kW and 63.3kW AC. interconnected through one existing TEP service.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2025 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the 3-phase service panel upgrade - INCR Clearance was called into TEP Pending solar |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1224-02304
Permit Description: Church Photovoltaic system addition, 60 new 520W modules (31.2kW DC) on a new steel structure. add to exist PV system of 69 460W modules for a combined DC system size of 61.7kW and 63.3kW AC. interconnected through one existing TEP service.
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/20/2025 | COT - CSOL - Grounding/Bonding Solar Project | Passed | ufer ground in pier | |
| 02/20/2025 | COT - LCBU - Excavation/Rebar/Zoning | Passed | Approved (4) pier foundations, okay for concrete placement | |
| 03/03/2025 | COT - CSOL - Electrical Underground Solar Project | Passed | Approved underground conduit from the solar structure to the the equipment location, okay to backfill progress areas | |
| 03/18/2025 | COT - CSOL - Electrical Final Solar Project | Passed | ||
| 03/18/2025 | COT - LCBU - Building Final | Passed | ||
| 03/18/2025 | COT - LCEL - Electrical Final | Passed | ||
| 03/18/2025 | ENGR Engineering Final | Passed | ||
| 03/18/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 03/18/2025 | COT - CSOL - Electrical Intermediate Solar Project | Passed | ||
| 03/18/2025 | COT - LCBU - Framing | Passed | ||
| 03/18/2025 | COT - CSOL - Outdoor Lighting Solar Project | Passed | ||
| 03/18/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter |