Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 3-phase service panel upgrade - INCR Clearance was called into TEP Pending solar |
|
| 03/11/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the supply side tap - DGL Clearance was called into TEP (not a service increase) Pending solar |
|
| 03/18/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter |