Permit: TC-COM-1224-02304

Parcel: 11820072C

Inspection Status: Partial Pass

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
03/11/2025 BULD - Electrical Clearance Partial Pass Partial for the 3-phase service panel upgrade - INCR Clearance was called into TEP
Pending solar
03/11/2025 BULD - Electrical Clearance Partial Pass Partial for the supply side tap - DGL Clearance was called into TEP (not a service increase)
Pending solar
03/18/2025 BULD - Electrical Clearance Passed Approved solar - DGC Clearance to TEP is required for the solar meter