Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Search

Parcel Attributes

Parcel11820072C
JurisdictionTucson, Pima County
City of Tucson ZoningR-3
Tucson WardWard 1
Tucson Registered NeighborhoodBarrio Santa Rita Park-West Ochoa
Major Street & Route

Arterial or Collector
-
Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 317 W 23RD ST
Date - 08/17/2026 5:40 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
1/4 Mile Each Direction (N, E, S, W) 202

Permits

Address: 317 W 23RD ST
Date - 08/17/2026 5:40 a.m.
Total Number Of Permits - (43)
Permit Status Apply Date Expired Date Unit Type Description
TC-COM-1224-02299 Complete 12/05/2024 06/16/2025 BLDG 5 Commercial Building Piping new 3/4" polyethylene gas line underground from existing gas meter to existing gas line stubbed out of wall serving water heater.
TC-COM-1224-02304 Complete 12/05/2024 09/21/2025 BLDG 5 Commercial Building Church Photovoltaic system addition, 60 new 520W modules (31.2kW DC) on a new steel structure. add to exist PV system of 69 460W modules for a combined DC system size of 61.7kW and 63.3kW AC. interconnected through one existing TEP service.
T19OT01070 Expired 11/12/2019 05/13/2020 Sign - Permanent Two freestanding signs at 14 sqft each on 23rd St
DS17-21 Approved 11/01/2017 N/A Zoning Verification Letter TSMR - TSMR 7-01.3.3.A - See Letter
TD-DEV-0924-00267 Complete 09/24/2024 04/03/2028 BLDG 5 Development Package The plan is for a single PV canopy in an existing parking lot, connecting to existing TEP service.
T21CM06416 Expired 08/09/2021 08/18/2025 Commercial Building Installation of 4 EV chargers.
DP17-0183 Complete 07/28/2017 07/22/2020 Development Package *Restricted Records//SITE/GRADE - Southside Fellowship, expansion.
DP19-0137 Complete 05/31/2019 04/11/2020 Development Package *Restricted Access//SITE - Southside Presb Church, solar PV on new steel parking canopy.
TR-UTL-0524-00917 Complete 05/07/2024 06/07/2024 Right-of-Way (ROW) - Utility wo#2695259 317 w 23rd st 14-13-24 nw replace hydrant north east corner of lot in dirt 6LF/sc
T02AN00190 ISSUED 02/28/2002 N/A ADDRNEW
T02AN01014 ISSUED 10/31/2002 N/A ADDRNEW
T02BU00669 FINAL 02/28/2002 12/02/2003 GRADING GRADING:400CY CUT & 150 CY FILL
T02CM01104 FINAL 02/27/2002 07/30/2003 COMBO SITE:MODULAR CLASSROOMS
T02CM03938 FINAL 08/21/2002 07/16/2003 COMBO ADDITION:CANOPY & ENTRANCE GATE
T02CM05274 FINAL 11/14/2002 07/11/2003 BLDG #3 COMBO MODULAR:CLASSROOM
T03CM05264 FINAL 11/05/2003 12/05/2004 COMBO NEW:PLAYGROUND
T05CM04183 C OF O 08/10/2005 02/26/2007 #4 COMBO NEW RESTROOM:LAUNDRY BUILDING
T09CM03122 FINAL 11/25/2009 08/23/2010 BLDG #2 COMBO SOLAR HOT WATER ON ROOF
T09MS00277 ISSUED 10/16/2009 N/A MISC
T16RW01006 FINAL 08/12/2016 09/18/2016 ROW 40 YD ROLLOFF FOR NEIGHBORHOOD CLEANUP- SANT RITA PARK NA WORK ORDER # WF5425160
T17RW04369 FINAL 10/04/2017 11/10/2017 ROW 40 YD ROLLOFF FOR NEIGHBORHOOD CLEANUP- SANTA RITA NA
T18BU00348 FINAL 06/06/2018 07/13/2020 BLDG #5 DEMO PARTIAL DEMO BLDG#5
T18CM04412 C OF O 06/06/2018 08/02/2020 BLDG #5 COMBO CHURCH
T18CM04832 FINAL 06/20/2018 05/05/2019 COMBO DUSK TO DAWN LIGHTING
T18FC00725 FINAL 08/31/2018 05/29/2019 FIRECONS INSTALL 4" FIRE LINE 210'.0
T18RW00822 FINAL 02/16/2018 05/24/2018 ROW Starting in the ally between W 22nd St and W 23trd west off S 9th Ave at TEP pole, Overlash to existing strand going East 58' continuing South 159', riser down pole and trench and or Bore West 74' placing a 3x3x3 pothole to Out of Row
T18RW01000 FINAL 02/28/2018 04/30/2018 ROW ADDITION OF 2 DRIVE ISLES TO ACCESS NEW PARKING LOT; 2 CURB CUTS ON 23RD ST 03/13/2018-PLAN CHANGE- SPEED TABLE WITH CROSSWALK
T18RW01659 FINAL 04/12/2018 05/12/2018 ROW 40 YD ROLLOFF FOR NEIGHBORHOOD CLEAN UP SANTA RITA PARK NA
T18RW03249 FINAL 07/25/2018 10/09/2018 ROW Starting on the S/E corner of W. 23rd St and S. 9th Ave at TEP pole, attach new strand and fiber going West for 270', riser down pole and trench / bore South 3' placing a 3x3x3 pothole for new PED, from PED continue Trench/bore East 21' then South 5' TO OUT OF ROW
T18RW04804 FINAL 10/26/2018 11/28/2018 ROW Installation of new 4" Fire service
T18RW04877 FINAL 10/31/2018 11/30/2018 ROW INSTALLATION OF DRIVEWAY APRON PER PAG SD 206 AND SIDEWALK PER PAG SD 200
T18RW05487 FINAL 12/12/2018 01/10/2019 ROW ASPHALT AND SIDEWALK REMOVAL AND REPLACEMENT (PER SD 200) FOR PRIMARY ELECTRIC SERVICE PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED.
T19CM04550 FINAL 06/26/2019 04/20/2020 COMBO PV CANOPY
T19FC00093 FINAL 02/04/2019 05/05/2020 FIRECONS Install new Sprinkler Monitoring Panel with Cell Dialer
T19FC00235 FINAL 04/03/2019 04/26/2020 FIRECONS Install Hood Fire System
T19FC00388 FINAL 05/21/2019 05/05/2020 FIRECONS New Fire Sprinkler System
T19FO00983 FINAL 11/07/2019 11/06/2020 FIREOPER FELLOWSHIP HALL OCC-256
T19RW00953 FINAL 02/21/2019 04/03/2019 ROW TIE NEW SEWER LINE INTO EXISTING SEWER LINE
T20CM01207 FINAL 02/22/2020 12/13/2021 BLDG #6 COMBO E - PLAY RAMADA IN COURTYARD
T20RW03057 FINAL 05/29/2020 07/31/2020 ROW (2) 5x5 bellholes in dirt/bltkop front--- to repair/replace gas line
T21CM09448 FINAL 12/10/2021 07/25/2022 COMBO Replacement of the existing evaporative cooler serving the kitchen with an air conditioning unit
T97CM02027 FINAL 07/08/1997 03/07/1998 COMBO TI:CLASSROOM CABINETS
T99CM03555 EXPIRED 07/26/1999 03/22/2000 COMBO HANDICAP RAMP & DOOR OPENINGS