Permit: TC-COM-1125-02157
Permit Details
Status:
Issued
Type:
Commercial Building
Address:
910 W IRVINGTON RD UNIT 180
Address NEW:
910 W IRVINGTON RD UNIT 180
Apply Date:
11/26/2025
Applicant:
Barbara Brown
Description:
INTERIOR TENANT IMPROVEMENT OF A 5,200 SF EXISTING SUITE, TO BE TURNED INTO A CANNABIS DISPENSARY.
Permit Reviews
Permit Number - TC-COM-1125-02157
Permit Status: Issued
Permit Description: INTERIOR TENANT IMPROVEMENT OF A 5,200 SF EXISTING SUITE, TO BE TURNED INTO A CANNABIS DISPENSARY.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/20/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/21/2026 | APPROVED |
| 12/08/2025 | COMMERCIAL REVIEW - FULL v.2 | 12/31/2025 | REQUIRES RESUBMIT |
| 06/04/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | N/A | APPROVED |
| 02/04/2026 | COMMERCIAL REVIEW - FULL v.4 | 02/27/2026 | REQUIRES RESUBMIT |
| 03/11/2026 | RESTAMP - COMMERCIAL v.1 | N/A | APPROVED |
| 03/11/2026 | COMMERCIAL REVIEW - FULL v.5 | 03/11/2026 | APPROVED |
| 12/04/2025 | COMMERCIAL REVIEW - FULL v.1 | 12/04/2025 | REQUIRES RESUBMIT |
| 01/08/2026 | COMMERCIAL REVIEW - FULL v.3 | 01/29/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-1125-02157
Permit Status: Issued
Permit Description: INTERIOR TENANT IMPROVEMENT OF A 5,200 SF EXISTING SUITE, TO BE TURNED INTO A CANNABIS DISPENSARY.
| Date | Description | Comments |
|---|---|---|
| 01/15/2026 | AIR BALANCING REPORT IS REQUIRED. | |
| 12/04/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 12/04/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 01/15/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-1125-02157
Permite Description: INTERIOR TENANT IMPROVEMENT OF A 5,200 SF EXISTING SUITE, TO BE TURNED INTO A CANNABIS DISPENSARY.
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/03/2026 | ENGR Engineering Final | N/A | Partial Pass | Okay to apply for a Level 3 TCO, however, site is not to be occupied. The Level 3 TCO is only intended to secure a potential lease. |
| 06/03/2026 | COT - HCBU - Building Final | N/A | Partial Pass | 6-3-26: pending retail floor receptacles/labelling & missing lavatory fixture. Okay to apply for a Level 3 TCO, however, site is not to be occupied. The Level 3 TCO is only intended to secure a potential lease. |
| 06/03/2026 | COT - HCEL - Electrical Final | N/A | Partial Pass | 6-3-26: pending retail floor receptacles/labelling & missing lavatory fixture. Okay to apply for a Level 3 TCO, however, site is not to be occupied. The Level 3 TCO is only intended to secure a potential lease. |
| 06/04/2026 | COT - HCPL - Plumbing Final | N/A | Partial Pass | 6-4-26: pending lavatory at break room. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-1125-02157
Permit Description: INTERIOR TENANT IMPROVEMENT OF A 5,200 SF EXISTING SUITE, TO BE TURNED INTO A CANNABIS DISPENSARY.
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/27/2026 | COT - HCPL - Rough Soil | Passed | 3-27-26: underground plumbing verified under test & per approved plans. Okay to backfill progress areas using shading materials. | |
| 05/11/2026 | COT - HCPL - Plumbing Above Ceiling | Passed | 5-11-26: plumbing above ceiling approved. | |
| 05/11/2026 | COT - HCME - Mechanical Intermediate | Passed | 5-11-26: mechanical intermediates approved. | |
| 05/11/2026 | COT - HCPL - Plumbing Intermediate | Passed | 5-11-26: plumbing intermediate approved. | |
| 05/11/2026 | COT - HCEL - Electrical Intermediate | Passed | 5-11-26: electrical intermediate approved. | |
| 05/11/2026 | COT - HCBU - Framing | Passed | 5-11-26: framing approved. | |
| 06/03/2026 | COT - FCON - Alarm - Final | Passed | ||
| 06/03/2026 | COT - FCON - Fire - Final | Passed | ||
| 06/03/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 06/03/2026 | COT - FCON - Sprinkler - Final | Passed | ||
| 06/03/2026 | COT - HCBU - Building Above Ceiling | Passed | 6-3-26: building above ceiling approved. | |
| 06/03/2026 | COT - HCEL - Electrical Above Ceiling | Passed | 6-3-26: electrical above ceiling approved. | |
| 06/03/2026 | COT - HCME - Mechanical Above Ceiling | Passed | 6-3-26: mechanical above ceiling approved. | |
| 06/04/2026 | COT - HCME - Mechanical Final | Passed | 6-4-26: mechanical final approved. |