Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/03/2026 | ENGR Engineering Final | Partial Pass | Okay to apply for a Level 3 TCO, however, site is not to be occupied. The Level 3 TCO is only intended to secure a potential lease. |