Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
330 N COMMERCE PARK LP
Apply Date:
11/05/2025
Applicant:
Cary Broschat
Description:
Installation of PV Solar shade canopies in parking lot of United Way 210.68 KW dc/ 161 KW ac associated DP- TD-DEV-0625-00167

Permit Reviews

Permit Number - TC-COM-1125-02029
Permit Status: Complete
Permit Description: Installation of PV Solar shade canopies in parking lot of United Way 210.68 KW dc/ 161 KW ac associated DP- TD-DEV-0625-00167
Start Date Submittal Complete Date Status  
05/06/2026 SPECIAL INSPECTION REVIEW v.2 05/12/2026 APPROVED Review Details
04/27/2026 SPECIAL INSPECTION REVIEW v.1 04/28/2026 REQUIRES RESUBMIT Review Details
11/06/2025 COMMERCIAL REVIEW - FULL v.1 12/03/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-1125-02029
Permit Status: Complete
Permit Description: Installation of PV Solar shade canopies in parking lot of United Way 210.68 KW dc/ 161 KW ac associated DP- TD-DEV-0625-00167
Date Description Comments
11/28/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
11/28/2025 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
12/01/2025 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
11/28/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
11/28/2025 SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED.
11/28/2025 SPECIAL INSPECTION FOR WELDING IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-1125-02029
Permite Description: Installation of PV Solar shade canopies in parking lot of United Way 210.68 KW dc/ 161 KW ac associated DP- TD-DEV-0625-00167
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
02/09/2026 COT - LCBU - Excavation/Rebar/Zoning N/A Partial Pass
02/09/2026 COT - CSOL - Electrical Underground Solar Project N/A Partial Pass

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-1125-02029
Permit Description: Installation of PV Solar shade canopies in parking lot of United Way 210.68 KW dc/ 161 KW ac associated DP- TD-DEV-0625-00167
Total Completed Inspections - 12
Date Description Inspector Results Comments
03/09/2026 COT - LCBU - Excavation/Rebar/Zoning Passed Passed for final canopy 3/9/26
03/09/2026 COT - CSOL - Electrical Underground Solar Project Passed Passed for final canopy 3/9/26
03/28/2026 Building Inspection - Outside Normal Hours Building Inspection Passed 03/28/2026
Approved per plan. Verified 300A backfeed breaker at switchgear box point of interconnection. Verified ACDS-01 disconnect switch and fuses. Okay to proceed in progress areas.
04/15/2026 BULD - Electrical Clearance Passed Clearance to TEP DGC. 4/15/2026
04/15/2026 COT - CSOL - Electrical Final Solar Project Passed
04/15/2026 COT - CSOL - Electrical Intermediate Solar Project Passed
04/15/2026 COT - CSOL - Outdoor Lighting Solar Project Passed
04/15/2026 COT - FCON - Fire - Final Passed
04/15/2026 COT - LCBU - Building Final Passed
04/15/2026 TRSP - ROW - Final/Close-Out Passed
04/15/2026 PDSD Building Division Pre-Construction Meeting Passed
04/17/2026 ENGR Engineering Final Passed There is equipment, connex box, dumpster etc that will be used for other permits. This is all secured by fencing without blocking access.