Inspection History Details
Inspection Status: Passed
Inspection History: COT - CSOL - Electrical Intermediate Solar Project
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/28/2026 | COT - CSOL - Electrical Intermediate Solar Project | Passed | 03/28/2026 Approved per plan. Verified 300A backfeed breaker at switchgear box point of interconnection. Verified ACDS-01 disconnect switch and fuses. Okay to proceed in progress areas. |