Inspection Status: Partial Pass

Inspection History: COT - LCBU - Excavation/Rebar/Zoning 

Permit Number - TC-COM-1125-02029

Inspection Description - COT - LCBU - Excavation/Rebar/Zoning 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
02/05/2026 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass 2/5/26: UFER APPROVED FOR CANOPY C. Reinforcement per approved plans at (3)spread footings for canopy C ok to proceed with concrete placement
02/06/2026 COT - LCBU - Excavation/Rebar/Zoning  Canceled
02/09/2026 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass
02/11/2026 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass 2/11/2026 total of 1 spread footer at canopy A. Okay for concrete placement.
02/12/2026 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass 2/12/2026 1 spread footer at canopy A meter 1. Okay for concrete placement.
02/19/2026 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass 2/19/2026 Meter 1. Total of 6 spread footings. Canopies D,E,&F. Okay for concrete placement.