Permit: TC-COM-1023-02486
Permit Details
Apply Date:
10/20/2023
Applicant:
Salah Ba Geri
Description:
Structural Foundation and Superstructure Plans for the Student Services Building with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review.
Permit Reviews
Permit Number - TC-COM-1023-02486
Permit Status: Needs resubmittal
Permit Description: Structural Foundation and Superstructure Plans for the Student Services Building with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/16/2024 | COMMERCIAL REVIEW - FULL v.4 | 02/21/2024 | APPROVED |
10/25/2023 | COMMERCIAL REVIEW - FULL v.1 | 01/05/2024 | REQUIRES RESUBMIT |
01/29/2024 | COMMERCIAL REVIEW - FULL v.2 | 01/29/2024 | REQUIRES RESUBMIT |
07/02/2024 | COMMERCIAL REVIEW - FULL v.1 | 08/05/2024 | APPROVED |
12/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/22/2024 | REQUIRES RESUBMIT |
02/21/2024 | RESTAMP - COMMERCIAL v.1 | 02/28/2024 | APPROVED |
02/09/2024 | COMMERCIAL REVIEW - FULL v.3 | 02/15/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-1023-02486
Permit Status: Needs resubmittal
Permit Description: Structural Foundation and Superstructure Plans for the Student Services Building with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review.
Total Outstanding Activity Conditions - 13
Date | Name |
---|---|
01/05/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
01/05/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
01/05/2024 | Elevator Designs must be submitted and approved prior to ... |
01/05/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
01/05/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
01/05/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
01/05/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
01/05/2024 | Masonry Inspection Report submittal review is required. |
01/05/2024 | Post-Installed Anchor Inspection Report is required. |
01/05/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
01/05/2024 | Stair Designs must be submitted and approved prior to... |
01/05/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
01/05/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-COM-1023-02486
Permit Status: Needs resubmittal
Permit Description: Structural Foundation and Superstructure Plans for the Student Services Building with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review.
Date | Description | Comments |
---|---|---|
10/25/2023 | Please provide plans which contain the Building Number 4 associated with this permit. | |
10/25/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Needs Resubmittal
Permit Number: TC-COM-1023-02486
Permite Description: Structural Foundation and Superstructure Plans for the Student Services Building with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review.
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/18/2024 | COT - HCEL - Grounding/Bonding | N/A | Partial Pass | |
08/06/2024 | COT - HCPL - Sewer | N/A | Partial Pass | Partial approval for two lines one for Grease interceptor and sewer lines and risers. OK to cover. |
08/22/2024 | COT - HCEL - Electrical Underground | N/A | Partial Pass | 8/22/24 I like to go underground under slab in student services building ok to cover |
12/09/2024 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | Student service building. Line B(1-7). Line D.7(1-1.5). Line 1(B-D.7). Line 6(C45-C8). 4th lift final and top out. North and west end. East end wall. Okay to grout progress areas. 12/9/2024 |
12/13/2024 | COT - HCBU - Preslab | N/A | Partial Pass | 12/13/24: reinforcement per plan at student services building level 2 deck GL A-E/1-6. |
09/09/2024 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Building #4. Partial pass. E1, E2, E5, AND E6. GRID LINE 6 FROM NORTH TO SOUTH. TOTAL OF 8. A4, AND A5. B5. C2, C3, C4, C.7(2) C.7(3). D4. D.3(4). WALLS TO ENTRY STAIRWELL. CENTER OF BUILDING A3-A3.3. Okay for concrete placement. 6/20/2024 Student services building by third party ok to place concrete for footers Building 4 line A/1-4,LINE 4/A-D, D1.8-4, I/A-C.5 AND INTERIOR COLUMN FOOTINGS C&B/ 2,3,4,5 BUILDING 1ELEVATOR PIT FOOTING 7/25/24 partial approval for column footings line E1-E2/B2 AND B2/E1-E.2 Virtual pass for elevator pit, stem wall and column footing OK to place concrete 9/9/24: reinforcement per plan at student service slab on grade. |
Completed Inspections
Permit Status: Needs Resubmittal
Permit Number: TC-COM-1023-02486
Permit Description: Structural Foundation and Superstructure Plans for the Student Services Building with associated underground work. Site utilities, grading, and drainage plans per Development Package are currently in review.
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/12/2024 | COT - HCBU - Stem Wall/Retaining Wall | Passed | ||
08/13/2024 | BULD - Electrical Clearance | Passed |