Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Excavation/Rebar/Zoning
Permit Number - TC-COM-1023-02486
Inspection Description - COT - HCBU - Excavation/Rebar/Zoning
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/20/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Building #4. Partial pass. E1, E2, E5, AND E6. GRID LINE 6 FROM NORTH TO SOUTH. TOTAL OF 8. A4, AND A5. B5. C2, C3, C4, C.7(2) C.7(3). D4. D.3(4). WALLS TO ENTRY STAIRWELL. CENTER OF BUILDING A3-A3.3. Okay for concrete placement. 6/20/2024 | |
06/27/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | ||
07/11/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | by 3rd party inspection | |
07/18/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | ||
07/25/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 7/25/24 partial approval for column footings line E1-E2/B2 AND B2/E1-E.2 | |
09/09/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Building #4. Partial pass. E1, E2, E5, AND E6. GRID LINE 6 FROM NORTH TO SOUTH. TOTAL OF 8. A4, AND A5. B5. C2, C3, C4, C.7(2) C.7(3). D4. D.3(4). WALLS TO ENTRY STAIRWELL. CENTER OF BUILDING A3-A3.3. Okay for concrete placement. 6/20/2024 Student services building by third party ok to place concrete for footers Building 4 line A/1-4,LINE 4/A-D, D1.8-4, I/A-C.5 AND INTERIOR COLUMN FOOTINGS C&B/ 2,3,4,5 BUILDING 1ELEVATOR PIT FOOTING 7/25/24 partial approval for column footings line E1-E2/B2 AND B2/E1-E.2 Virtual pass for elevator pit, stem wall and column footing OK to place concrete 9/9/24: reinforcement per plan at student service slab on grade. |
|
10/04/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Building #4; West CMU wall (approximately 45’) at 0’ - 4’ AFFE, #5 rebar. OK to place grout in all cells. | |
12/13/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Building #4. Partial pass. E1, E2, E5, AND E6. GRID LINE 6 FROM NORTH TO SOUTH. TOTAL OF 8. A4, AND A5. B5. C2, C3, C4, C.7(2) C.7(3). D4. D.3(4). WALLS TO ENTRY STAIRWELL. CENTER OF BUILDING A3-A3.3. Okay for concrete placement. 6/20/2024 Student services building by third party ok to place concrete for footers Building 4 line A/1-4,LINE 4/A-D, D1.8-4, I/A-C.5 AND INTERIOR COLUMN FOOTINGS C&B/ 2,3,4,5 BUILDING 1ELEVATOR PIT FOOTING 7/25/24 partial approval for column footings line E1-E2/B2 AND B2/E1-E.2 Virtual pass for elevator pit, stem wall and column footing OK to place concrete 9/9/24: reinforcement per plan at student service slab on grade. 12/13/24: reinforcement per plan at student services building level 2 deck GL A-E/1-6. |