Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Masonry Pregrout
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/14/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | Elevator walls at 6’4” AFFE at Level #2. Stairwell #2 East wall at 6’4” AFFE at Level #2. OK to place grout in progress areas. | |
| 01/17/2025 | COT - HCBU - Masonry Pregrout | Passed | ||
| 01/23/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | ||
| 01/30/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | ||
| 02/19/2025 | COT - HCBU - Masonry Pregrout | Not Ready | ||
| 02/28/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | 2-28-25, previously inspected & approved for grout. Note: site walls are inspected by engineering |
|
| 03/25/2026 | COT - HCBU - Masonry Pregrout | Passed | ||
| 04/09/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | Site perimeter wall (West) 14’ wall at 1st lift. 24’ wall at top out. 46’ wall at 1st lift. 12’ frame panel at 1st lift. 24’ wall at 1st lift. Stem wall at basin. At top out. Okay to grout progress areas. All reinforcements per plan. 4/9/2025 |
|
| 04/10/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | Southwest portion of stem wall/retaining wall topped-out at approximately 86 feet. Ok to grout progress area and cap completed areas. | |
| 05/05/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | ||
| 05/06/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | ||
| 09/19/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | ||
| 10/14/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | By third party, west site wall, NORTH WEST CORNER TO student services to the south west corner of admin, 0-4' first lift Student services bldg corner 0-4' Entry corner line 3,3.3 / A-A.7 0 -4' |
|
| 10/17/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | 2nd lift ok for grout | |
| 10/23/2024 | COT - HCBU - Masonry Pregrout | Not Ready | ||
| 10/24/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | 3rd lift ok to place on elevator, staircase and building CMU walls line A/3.3-4.2 AND B/1-2.9 | |
| 10/29/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | 4th lift on elevator and staircase CMU walls 12' to 16' ok to place grout | |
| 11/12/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | Partial pass. 3rd lift. Student services Bld. Line A/3.3-4.1. Line B/2-2.9. Line 2.9/A.7-B. Okay to grout progress areas. 11/12/2024 | |
| 11/22/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | Grid line 6 , between B/D and west wall grid line 1 B/E ok for First lift | |
| 11/25/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | ||
| 12/09/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | Student service building. Line B(1-7). Line D.7(1-1.5). Line 1(B-D.7). Line 6(C45-C8). 4th lift final and top out. North and west end. East end wall. Okay to grout progress areas. 12/9/2024 |