Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Masonry Pregrout
Permit Number - TC-COM-1023-02486
Inspection Description - COT - HCBU - Masonry Pregrout
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/14/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | By third party, west site wall, NORTH WEST CORNER TO student services to the south west corner of admin, 0-4' first lift Student services bldg corner 0-4' Entry corner line 3,3.3 / A-A.7 0 -4' |
|
10/17/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | 2nd lift ok for grout | |
10/23/2024 | COT - HCBU - Masonry Pregrout | Not Ready | ||
10/24/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | 3rd lift ok to place on elevator, staircase and building CMU walls line A/3.3-4.2 AND B/1-2.9 | |
10/29/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | 4th lift on elevator and staircase CMU walls 12' to 16' ok to place grout | |
11/12/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | Partial pass. 3rd lift. Student services Bld. Line A/3.3-4.1. Line B/2-2.9. Line 2.9/A.7-B. Okay to grout progress areas. 11/12/2024 | |
11/22/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | Grid line 6 , between B/D and west wall grid line 1 B/E ok for First lift | |
11/25/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | ||
12/09/2024 | COT - HCBU - Masonry Pregrout | Partial Pass | Student service building. Line B(1-7). Line D.7(1-1.5). Line 1(B-D.7). Line 6(C45-C8). 4th lift final and top out. North and west end. East end wall. Okay to grout progress areas. 12/9/2024 |