Inspection Status: Partial Pass

Inspection History: COT - HCBU - Framing

Date Description Inspector Results Comments
01/23/2025 COT - HCBU - Framing Partial Pass 3/12 nailing pattern not complete on shearwall
02/07/2025 COT - HCBU - Framing Partial Pass
03/25/2026 COT - HCBU - Framing Passed
04/01/2025 COT - HCBU - Framing Re-inspection required 4/1/2025 nailing pattern not per plan at shear wall north end of building second floor. Stopped inspection.
04/08/2025 COT - HCBU - Framing Partial Pass 4-8-25, 2nd floor exterior structural shear wall sleep suites 202-208 nailing approved. (Pending interior framing and TI), North balcony nailing together with South balcony approved.Okay to continue construction at progress areas.
04/25/2025 COT - HCBU - Framing Partial Pass
05/06/2025 COT - HCBU - Framing Partial Pass