Permit: TC-COM-1023-02375
Permit Details
Apply Date:
10/09/2023
Applicant:
Ricky Williams
Description:
THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN. A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE
Permit Reviews
Permit Number - TC-COM-1023-02375
Permit Status: Complete
Permit Description: THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN.
A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/10/2023 | COMMERCIAL REVIEW - FULL v.1 | 11/02/2023 | REQUIRES RESUBMIT |
04/22/2024 | COMMERCIAL REVIEW - FULL v.3 | 04/23/2024 | APPROVED |
01/25/2024 | COMMERCIAL REVIEW - FULL v.3 | 01/26/2024 | APPROVED |
10/22/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 10/22/2024 | APPROVED |
03/28/2024 | COMMERCIAL REVIEW - FULL v.2 | 04/02/2024 | REQUIRES RESUBMIT |
12/19/2023 | COMMERCIAL REVIEW - FULL v.2 | 01/09/2024 | REQUIRES RESUBMIT |
01/26/2024 | RESTAMP - COMMERCIAL v.1 | 01/30/2024 | APPROVED |
09/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 09/16/2024 | APPROVED |
09/19/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/20/2024 | APPROVED |
10/10/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/15/2024 | APPROVED |
09/17/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/18/2024 | APPROVED |
03/01/2024 | COMMERCIAL REVIEW - FULL v.1 | 03/28/2024 | REQUIRES RESUBMIT |
02/14/2024 | RESTAMP - COMMERCIAL v.1 | 02/26/2024 | APPROVED |
04/23/2024 | RESTAMP - COMMERCIAL v.1 | 04/25/2024 | APPROVED |
10/21/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/21/2024 | REQUIRES RESUBMIT |
08/30/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/30/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-1023-02375
Permit Status: Complete
Permit Description: THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN.
A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE
Date | Description | Comments |
---|---|---|
10/13/2023 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
01/26/2024 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
01/26/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
09/18/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
02/15/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
10/10/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
09/18/2024 | SPECIAL INSPECTION FOR DRILLED PIERS IS REQUIRED. | |
01/26/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/26/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
01/26/2024 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
09/18/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
01/26/2024 | Masonry Inspection Report submittal review is required. | |
01/26/2024 | FREESTANDING CANOPY SYSTEMS Designs must be submitted and approved prior to ... | |
01/26/2024 | HIGH-PILED STORAGE SYSTEM Designs must be submitted and approved prior to final. | |
01/26/2024 | MATERIAL HANDLING EQUIPMENT INCLUDING THE PREFABRICATED EQUIPMENT PALTFORMS AND ACCESS STAIRS Designs must be submitted and approved prior to ... | |
01/26/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
01/26/2024 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1023-02375
Permite Description: THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN.
A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE
Total Outstanding Inspections - 8
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/09/2024 | COT - HCBU - Preslab | N/A | Partial Pass | Pre con meeting 4/2/24: (6) pit leveler's reinforcement per plan GL F/2.5 - F/5.5, (4) Dock pit slabs per plan GL F/5.5 - F/7.5, Preslab at office area passed ok to proceed, pending sewer ejector pump, pre slab at remote restrooms ok to proceed. Electrical underground at conference room ok to pour. 4/9/24: smoking shelter concrete slab reinforcement per plan ok to place concrete. |
08/19/2024 | COT - HCME - Mechanical Final | N/A | Re-inspection required | 8/19/24: (Office area inspection) Grab Bars not installed at time of inspection, coat hangers not per ADA requirements, properly mount instantaneous water heaters at restrooms, GFCI receptacles required under Lavatories, panel schedules must be made up prior to final, inspection of equipment on roof pending. Water heater piping must be insulated. |
08/19/2024 | COT - HCPL - Plumbing Final | N/A | Re-inspection required | 8/19/24: (Office area inspection) Grab Bars not installed at time of inspection, coat hangers not per ADA requirements, properly mount instantaneous water heaters at restrooms, GFCI receptacles required under Lavatories, panel schedules must be made up prior to final, inspection of equipment on roof pending. Water heater piping must be insulated. |
08/19/2024 | COT - HCEL - Electrical Final | N/A | Re-inspection required | 8/19/24: (Office area inspection) Grab Bars not installed at time of inspection, coat hangers not per ADA requirements, properly mount instantaneous water heaters at restrooms, GFCI receptacles required under Lavatories, panel schedules must be made up prior to final, inspection of equipment on roof pending. Water heater piping must be insulated. |
09/16/2024 | COT - FCON - Fire - Final | N/A | Partial Pass | Delayed egress on turnstiles still needs to be verified. |
04/08/2024 | ENGR Engineering Final | N/A | Partial Pass | My inspection consisted of looking at front walk forms only to ensure the walk would be correctly poured. |
09/13/2024 | COT - FCON - Alarm - Final | N/A | Partial Pass | Delayed egress for turnstiles need to be tested. |
10/08/2024 | COT - HCBU - Building Final | N/A | Partial Pass | 8/19/24: Ok for Level 1 TCO in Office area only. 9/16/2024. Okay for level 4 TCO. pending other inspections, and documentation on civil and special reports. 10/8/24: pending conditions. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1023-02375
Permit Description: THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN.
A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/06/2024 | BULD - Electrical Clearance | Passed | 6/3/24: canceled per contractor 6/5/24: not ready 6/6/24: TEP ECO CLEARANCE 3780 E. Valencia RD TUC SUITE 190 SES-B |
|
07/01/2024 | COT - HCBU - Framing | Passed | ||
07/03/2024 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | ||
07/18/2024 | COT - HCBU - Preslab | Passed | Pre con meeting 4/2/24: (6) pit leveler's reinforcement per plan GL F/2.5 - F/5.5, (4) Dock pit slabs per plan GL F/5.5 - F/7.5, Preslab at office area passed ok to proceed, pending sewer ejector pump, pre slab at remote restrooms ok to proceed. Electrical underground at conference room ok to pour. 4/23/24 awaiting third-party inspection for infill on exterior CMU block 4/19/24 pre-slab at pit leveler ok to place concrete w/verticals for block wall 4/9/24: smoking shelter concrete slab reinforcement per plan ok to place concrete. 4/11/24: reinforcement per plan at (4) New Dock pit slab. Ok to pour slab only at new dock pits. Walls at new dock pits missing 2 #4 horizontal. 8 (Mark 46) footings at new canopy south of building per plan ok to place concrete. 8 (Mark 60) footings at new canopy south of building per plan ok to place concrete. Ok to place concrete at entry security electrical underground. 4/17/24: dock pits reinforced per plan ok to pour. 5/14/24: Preslab at sewer ejector passed. Ok to proceed. 7/18/24: Light pole bases reinforcement per plan for 6 light poles ok to proceed. |
|
07/18/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
08/05/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
08/14/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
08/14/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
08/14/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
08/14/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
08/14/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
08/14/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
09/16/2024 | COT - HCME - Mechanical Final | Passed | 8/16/2024. All corrections were made. | |
09/13/2024 | COT - FCON - Sprinkler - Final | Passed | ||
09/16/2024 | COT - HCPL - Plumbing Final | Passed | 8/16/2024. All corrections were made. | |
09/16/2024 | COT - HCEL - Electrical Final | Passed | 8/16/2024. All corrections were made. | |
09/16/2024 | COT - HCPL - Rough Soil | Passed | ||
09/16/2024 | COT - LCBU - Masonry Pregrout | Passed | ||
09/17/2024 | COT - FCON - Fire - Final | Passed | ||
10/09/2024 | ENGR Engineering Final | Passed | ||
10/09/2024 | COT - FCON - Alarm - Final | Passed | ||
10/10/2024 | COT - HCBU - Building Final | Passed |