Permit: TC-COM-1023-02346
Permit Details
Apply Date:
10/04/2023
Applicant:
burak bekat
Description:
Tenant Improvement of Lab
Permit Reviews
Permit Number - TC-COM-1023-02346
Permit Status: Complete
Permit Description: Tenant Improvement of Lab
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/28/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/01/2024 | APPROVED |
10/09/2023 | COMMERCIAL REVIEW - FULL v.1 | 12/21/2023 | APPROVED |
07/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/17/2024 | APPROVED |
06/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/26/2024 | APPROVED |
12/21/2023 | RESTAMP - COMMERCIAL v.1 | 12/23/2023 | APPROVED |
Conditions
Permit Number - TC-COM-1023-02346
Permit Status: Complete
Permit Description: Tenant Improvement of Lab
Date | Description | Comments |
---|---|---|
12/21/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
10/09/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
12/21/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
12/21/2023 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
01/22/2024 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Lucinda.Hyatt@pima.gov for review and assessment. | |
12/21/2023 | Post-Installed Anchor Inspection Report is required. | |
12/21/2023 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1023-02346
Permite Description: Tenant Improvement of Lab
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/01/2024 | COT - HCPL - Sewer | N/A | Not Applicable | |
05/01/2024 | COT - HCPL - Rough Soil | N/A | Not Applicable | |
06/06/2024 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 4/8/24: Called Brent at 9:24am, no answer. Showed up on site and called at 9:40am, no answer. No Access to site. 4/9/24 partial approval for two electric room conduits into Raceway and panel. No wire installed yet. 6/6/24: electrical above ceiling passed in west and east electrical room (ok to set tile), electrical above ceiling passed in room 106 (ok to set tile on west half), |
06/06/2024 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | 6/6/24: progress inspection on hard duct. Pending flex duct and supports. |
04/19/2024 | COT - HCPL - Plumbing Above Ceiling | N/A | Partial Pass | Rommel 105 only 4/19/24 |
06/21/2024 | COT - FCON - Alarm - Final | N/A | Not Applicable | |
06/21/2024 | COT - FCON - Sprinkler - Final | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1023-02346
Permit Description: Tenant Improvement of Lab
Total Completed Inspections - 18
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/19/2024 | COT - HCBU - Framing | Passed | ||
04/22/2024 | COT - HCPL - Plumbing Intermediate | Passed | 4/22/24: passed. ok to proceed | |
05/01/2024 | COT - HCBU - Preslab | Passed | 5/1/24: reinforcement at tank pad per plan ok to place concrete | |
05/03/2024 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | 5/3/24: fire wall passed. | |
06/10/2024 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
06/12/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
06/12/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
06/18/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
06/18/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
06/18/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
06/20/2024 | COT - HCPL - Plumbing Final | Passed | ||
06/20/2024 | COT - HCME - Mechanical Final | Passed | ||
06/20/2024 | COT - HCEL - Electrical Final | Passed | ||
06/21/2024 | COT - FCON - Fire - Final | Passed | ||
06/21/2024 | ENGR Engineering Final | Passed | ||
06/21/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
06/21/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
06/25/2024 | COT - HCBU - Building Final | Passed | 6/21/24: OK FOR LEVEL 4 TCO. 6/25/24: ok for CofO |