Permit: TC-COM-1023-02344
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
1400 N SILVERBELL RD
Address NEW:
1400 N SILVERBELL RD
Apply Date:
10/04/2023
Applicant:
JR Durazo
Description:
Redevelopment of existing public park to include ballfields, new sidewalks, site lighting, concessions building, restrooms, and a new splash pad.
Permit Reviews
Permit Number - TC-COM-1023-02344
Permit Status: Complete
Permit Description: Redevelopment of existing public park to include ballfields, new sidewalks, site lighting, concessions building, restrooms, and a new splash pad.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/05/2023 | COMMERCIAL REVIEW - FULL v.1 | 10/30/2023 | REQUIRES RESUBMIT |
| 12/15/2023 | COMMERCIAL REVIEW - FULL v.3 | 12/22/2023 | REQUIRES RESUBMIT |
| 11/16/2023 | COMMERCIAL REVIEW - FULL v.2 | 11/24/2023 | REQUIRES RESUBMIT |
| 07/25/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.4 | 07/28/2025 | APPROVED |
| 12/24/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 12/27/2024 | REQUIRES RESUBMIT |
| 07/08/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/10/2024 | REQUIRES RESUBMIT |
| 07/18/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 07/23/2025 | REQUIRES RESUBMIT |
| 02/12/2024 | COMMERCIAL REVIEW - FULL v.5 | 02/15/2024 | APPROVED |
| 04/02/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/04/2024 | APPROVED |
| 05/21/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 05/22/2024 | APPROVED |
| 05/10/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/10/2024 | REQUIRES RESUBMIT |
| 01/16/2024 | COMMERCIAL REVIEW - FULL v.4 | 01/17/2024 | REQUIRES RESUBMIT |
| 02/15/2024 | RESTAMP - COMMERCIAL v.1 | 02/23/2024 | APPROVED |
Conditions
Permit Number - TC-COM-1023-02344
Permit Status: Complete
Permit Description: Redevelopment of existing public park to include ballfields, new sidewalks, site lighting, concessions building, restrooms, and a new splash pad.
| Date | Description | Comments |
|---|---|---|
| 02/15/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 10/05/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 02/15/2024 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 02/15/2024 | Masonry Inspection Report submittal review is required. | |
| 02/15/2024 | Masonry Inspection Report submittal review is required. | |
| 02/15/2024 | Fabric Shade Structures Designs must be submitted and approved prior to final. | |
| 02/15/2024 | Fabric Shade Structures Designs must be submitted and approved prior to final. | |
| 02/15/2024 | Fabric Shade Structures Designs must be submitted and approved prior to final. | |
| 02/15/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1023-02344
Permite Description: Redevelopment of existing public park to include ballfields, new sidewalks, site lighting, concessions building, restrooms, and a new splash pad.
Total Outstanding Inspections - 10
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/31/2024 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | Partial pass. All of concession building approved. Okay to proceed progress areas. 10/31/2024 |
| 10/31/2024 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | Partial pass. All of concession building approved. Okay to proceed progress areas. 10/31/2024 |
| 01/23/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 05/15/2025 | COT - FCON - Fire - Final | N/A | Partial Pass | The Concession stand is approved. |
| 04/30/2025 | COT - HCBU - TCO | N/A | Re-inspection required | 4-30-25, paint all exterior plastics at concession stand. Adjust men's & family bathroom door's to 5 pounds of pressure. |
| 08/14/2024 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Partial approval for last Ramada (third) at splash pad cluster ok to place concrete for 4 columns. |
| 10/16/2024 | COT - HCBU - Framing | N/A | Partial Pass | |
| 06/28/2024 | COT - HCEL - Electrical Underground | N/A | Partial Pass | |
| 07/26/2024 | COT - HCBU - Preslab | N/A | Not Ready | Inspection canceled by contractor |
| 10/30/2024 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | DWV on test throughout all of concession building. Okay to proceed progress areas. 10/30/2024 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1023-02344
Permit Description: Redevelopment of existing public park to include ballfields, new sidewalks, site lighting, concessions building, restrooms, and a new splash pad.
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2024 | COT - HCEL - Grounding/Bonding | Passed | Building ufer is in place. | |
| 01/10/2025 | COT - HCEL - Electrical Intermediate | Passed | ||
| 01/10/2025 | COT - HCME - Mechanical Intermediate | Passed | ||
| 01/27/2025 | COT - HCEL - Electrical Final | Passed | 1-27-25, electrical final for concession stand approved. | |
| 03/26/2025 | Pool/Spa - Bonding Grip | Passed | 3-26-25, reinforcement for splash pad verified per plans & is bonded at 6 locations. Okay to pour concrete. | |
| 05/30/2025 | COT - HCME - Mechanical Final | Passed | ||
| 05/30/2025 | Pool/Spa - Electric | Passed | ||
| 05/30/2025 | COT - HCBU - Building Final | Passed | ||
| 05/30/2025 | COT - HCPL - Rough Soil | Passed | ||
| 05/29/2025 | COT - FCON - Fire - Final | Passed | ||
| 05/30/2025 | COT - HCBU - TCO | Passed | Ok to apply for a Level #4 Temporary Certificate of Occupancy. All inspections are complete; permit holder may apply for a,Certificate of Occupancy. | |
| 05/30/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 05/30/2025 | COT - HCBU - Framing | Passed | ||
| 05/30/2025 | BULD - Electrical Clearance | Passed | No electric clearance required. | |
| 05/30/2025 | COT - HCEL - Electrical Underground | Passed | ||
| 05/30/2025 | COT - HCEL - Outdoor Lighting | Passed | ||
| 05/30/2025 | COT - HCBU - Preslab | Passed | ||
| 05/30/2025 | COT - HCPL - Plumbing Final | Passed | ||
| 05/30/2025 | COT - HCPL - Yard Water Line | Passed | ||
| 05/30/2025 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 07/03/2025 | ENGR Engineering Final | Passed | ||
| 07/02/2025 | TRSP - ROW - Final/Close-Out | Passed |