Parcel: 11520198A

Inspection Status: Partial Pass

Inspection History: COT - HCBU - Excavation/Rebar/Zoning 

Permit Number - TC-COM-1023-02344

Inspection Description - COT - HCBU - Excavation/Rebar/Zoning 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
02/10/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass
02/20/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Partial approval for interior footings in concession stand OK to place concrete on interior footings per print
Partial approval for 60 x 30 Ramada OK to place concrete at 8 pole bases
Partial approval for 91477 pole base, 90005, 91489, 90381 ok to place concrete
Partial approval for two Ramadas at splash pad cluster ok to place concrete for 8 columns.
Partial approval for the 25 x 30 Ramada four columns we'll get a place concrete
Partial approval for the third Ramada at splash pad cluster ok to place concrete for 4 columns.
8/15/24: partial approval for the (2) 16x16 Ramada four columns ok to place concrete.
8/16/24: 1 course at stem wall at concession stand per plan ok to proceed.
9/4/24 baseball field shade structures, foundation for 4 footers NE field west side and SE field north side 4 footers. Ok to place concrete.
9/9/24: 12 bleacher footings at baseball field station 33019 per plan ok to proceed.
9/16/24 by 3rd party report for connection building 1st lift
9/17/24 partial for maintenance yard fence wall 8 foot tall, approximately 30 feet on south west wall 4 feet high OK to grout
9/18/24 partial approval for concession stand second lift OK to grout
10/7/24 partial for maintenance yard pre grout
2/10/25 partial approval for footer on restrooms at splash pad. OK to place footer concrete.
2/20/25: reinforcement per plan at footings for bathroom columns. Ok to proceed, reinforcement per plan at splash pad tank.
03/05/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 3-5-25, Excavation/rebar inspection for Rooms-Splash, Chlorine, Acid, & Restrooms #'s 201, 207, 206, 205, 204, 203, & 202.Reinforcement verified per plans-okay to grout 1st lift at 4' 6".
03/20/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Partial approval for interior footings in concession stand OK to place concrete on interior footings per print
Partial approval for 60 x 30 Ramada OK to place concrete at 8 pole bases
Partial approval for 91477 pole base, 90005, 91489, 90381 ok to place concrete
Partial approval for two Ramadas at splash pad cluster ok to place concrete for 8 columns.

Partial approval for the 25 x 30 Ramada four columns we'll get a place concrete
Partial approval for the third Ramada at splash pad cluster ok to place concrete for 4 columns.
8/15/24: partial approval for the (2) 16x16 Ramada four columns ok to place concrete.
8/16/24: 1 course at stem wall at concession stand per plan ok to proceed.
9/4/24 baseball field shade structures, foundation for 4 footers NE field west side and SE field north side 4 footers. Ok to place concrete.
9/9/24: 12 bleacher footings at baseball field station 33019 per plan ok to proceed.
9/16/24 by 3rd party report for connection building 1st lift
9/17/24 partial for maintenance yard fence wall 8 foot tall, approximately 30 feet on south west wall 4 feet high OK to grout
9/18/24 partial approval for concession stand second lift OK to grout
10/7/24 partial for maintenance yard pre grout
2/10/25 partial approval for footer on restrooms at splash pad. OK to place footer concrete.
2/20/25: reinforcement per plan at footings for bathroom columns. Ok to proceed, reinforcement per plan at splash pad tank.

3-5-25, Excavation/rebar inspection for Rooms-Splash, Chlorine, Acid, & Restrooms #'s 201, 207, 206, 205, 204, 203, & 202.Reinforcement verified per plans-okay to grout 1st lift at 4' 6".
3/20/25: reinforcement per plan at restrooms and splash pad rooms at top out ok to proceed
04/10/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Partial approval for interior footings in concession stand OK to place concrete on interior footings per print
Partial approval for 60 x 30 Ramada OK to place concrete at 8 pole bases
Partial approval for 91477 pole base, 90005, 91489, 90381 ok to place concrete
Partial approval for two Ramadas at splash pad cluster ok to place concrete for 8 columns.

Partial approval for the 25 x 30 Ramada four columns we'll get a place concrete
Partial approval for the third Ramada at splash pad cluster ok to place concrete for 4 columns.
8/15/24: partial approval for the (2) 16x16 Ramada four columns ok to place concrete.
8/16/24: 1 course at stem wall at concession stand per plan ok to proceed.
9/4/24 baseball field shade structures, foundation for 4 footers NE field west side and SE field north side 4 footers. Ok to place concrete.
9/9/24: 12 bleacher footings at baseball field station 33019 per plan ok to proceed.
9/16/24 by 3rd party report for connection building 1st lift
9/17/24 partial for maintenance yard fence wall 8 foot tall, approximately 30 feet on south west wall 4 feet high OK to grout
9/18/24 partial approval for concession stand second lift OK to grout
10/7/24 partial for maintenance yard pre grout
2/10/25 partial approval for footer on restrooms at splash pad. OK to place footer concrete.
2/20/25: reinforcement per plan at footings for bathroom columns. Ok to proceed, reinforcement per plan at splash pad tank.

3-5-25, Excavation/rebar inspection for Rooms-Splash, Chlorine, Acid, & Restrooms #'s 201, 207, 206, 205, 204, 203, & 202.Reinforcement verified per plans-okay to grout 1st lift at 4' 6".
3/20/25: reinforcement per plan at restrooms and splash pad rooms at top out ok to proceed
4/10/25: reinforcement per plan at splash pad and Ramada footings.
04/22/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 4/22/2025. Reinforcements and footings per plan for 6´ masonry wall and top of surge tank. Okay for concrete placement.
05/30/2025 COT - HCBU - Excavation/Rebar/Zoning  Passed
08/05/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Partial approval for interior footings in concession and restrooms stand OK to place concrete on interior footings per print
08/06/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Partial approval for 60 x 30 Ramada OK to place concrete at 8 pole bases
08/13/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Partial approval for 91477 pole base, 90005, 91489, 90381 ok to place concrete
Partial approval for two Ramadas at splash pad cluster ok to place concrete for 8 columns.
Partial approval for the 25 x 30 Ramada four columns we'll get a place concrete
08/14/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Partial approval for last Ramada (third) at splash pad cluster ok to place concrete for 4 columns.
08/15/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Partial approval for interior footings in concession stand OK to place concrete on interior footings per print
Partial approval for 60 x 30 Ramada OK to place concrete at 8 pole bases
Partial approval for 91477 pole base, 90005, 91489, 90381 ok to place concrete
Partial approval for two Ramadas at splash pad cluster ok to place concrete for 8 columns.
Partial approval for the 25 x 30 Ramada four columns we'll get a place concrete
Partial approval for the third Ramada at splash pad cluster ok to place concrete for 4 columns.
8/15/24: partial approval for the (2) 16x16 Ramada four columns ok to place concrete.
08/16/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Partial approval for interior footings in concession stand OK to place concrete on interior footings per print
Partial approval for 60 x 30 Ramada OK to place concrete at 8 pole bases
Partial approval for 91477 pole base, 90005, 91489, 90381 ok to place concrete
Partial approval for two Ramadas at splash pad cluster ok to place concrete for 8 columns.
Partial approval for the 25 x 30 Ramada four columns we'll get a place concrete
Partial approval for the third Ramada at splash pad cluster ok to place concrete for 4 columns.
8/15/24: partial approval for the (2) 16x16 Ramada four columns ok to place concrete.
8/16/24: 1 course at stem wall at concession stand per plan ok to proceed.
09/05/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 9/4/24 baseball field shade structures, foundation for 4 footers NE field west side and SE field north side 4 footers. Ok to place concrete.
09/09/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Partial approval for interior footings in concession stand OK to place concrete on interior footings per print
Partial approval for 60 x 30 Ramada OK to place concrete at 8 pole bases
Partial approval for 91477 pole base, 90005, 91489, 90381 ok to place concrete
Partial approval for two Ramadas at splash pad cluster ok to place concrete for 8 columns.
Partial approval for the 25 x 30 Ramada four columns we'll get a place concrete
Partial approval for the third Ramada at splash pad cluster ok to place concrete for 4 columns.
8/15/24: partial approval for the (2) 16x16 Ramada four columns ok to place concrete.
8/16/24: 1 course at stem wall at concession stand per plan ok to proceed.
9/4/24 baseball field shade structures, foundation for 4 footers NE field west side and SE field north side 4 footers. Ok to place concrete.
9/9/24: 12 bleacher footings at baseball field station 33019 per plan ok to proceed.
09/16/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 9/16/24 by 3rd party report for connection building 1st lift
09/17/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 9/17/24 partial for maintenance yard fence wall 8 foot tall, approximately 30 feet on south west wall 4 feet high OK to grout
09/18/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 9/18/24 partial approval for concession stand second lift OK to grout
09/25/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Concessions building CMU walls at North wall topped out at 15 feet; East, West, and South walls at 8’ - 12’. Ok to grout progress areas. Maintenance area building, NorthWest CMU walls at 0’ - 4’; Ok to grout progress areas.
10/07/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 10/7/24 partial for maintenance yard pre grout
12/02/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Electrical grounding rods at main disconnect.