Parcel: 11520198A

Inspection Status: Not Ready

Inspection History: COT - HCPL - Rough Soil 

Permit Number - TC-COM-1023-02344

Inspection Description - COT - HCPL - Rough Soil 

Inspection Status - Not Ready

Date Description Inspector Results Comments
01/23/2025 COT - HCPL - Rough Soil  Not Ready
01/27/2025 COT - HCPL - Rough Soil  Passed 1-25-27, grease interceptor behind concession stand verified under pressure. Okay to backfill and continue with construction.
02/20/2025 COT - HCPL - Rough Soil  Partial Pass 2/20/25: plumbing underground at bathrooms and splash pad under pressure. Ok to backfill.
02/21/2025 COT - HCPL - Rough Soil  Partial Pass 2/20/25: plumbing underground at bathrooms and splash pad under pressure. Ok to backfill.
2/21/25: Pressure test for 3'' and 1'' domestic lines. Approved
02/25/2025 COT - HCPL - Rough Soil  Partial Pass
03/17/2025 COT - HCPL - Rough Soil  Partial Pass Sewer line from restroom to main sewer line: 4” to 6” at approximately 50’. Ok to cover progress area.
05/30/2025 COT - HCPL - Rough Soil  Passed
07/11/2024 COT - HCPL - Rough Soil  Partial Pass 7/11/24: plumbing underground at concession stand building for bathrooms and kitchen per plan ok to proceed. Pending grease interceptor tie in.