Permit: TC-COM-0824-01551
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
10165 E OLD VAIL RD UNIT 111
Address NEW:
10165 E OLD VAIL RD UNIT 111
Apply Date:
08/08/2024
Applicant:
Justin Anderson
Description:
TI: Jeremiah's Italian Ice
Permit Reviews
Permit Number - TC-COM-0824-01551
Permit Status: Complete
Permit Description: TI: Jeremiah's Italian Ice
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/09/2024 | RESTAMP - COMMERCIAL v.1 | 10/10/2024 | APPROVED |
| 08/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/07/2025 | APPROVED |
| 10/04/2024 | COMMERCIAL REVIEW - LIMITED v.2 | 10/09/2024 | APPROVED |
| 08/09/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 08/27/2024 | REQUIRES RESUBMIT |
| 07/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/30/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0824-01551
Permit Status: Complete
Permit Description: TI: Jeremiah's Italian Ice
| Date | Description | Comments |
|---|---|---|
| 08/22/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 10/10/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 10/31/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0824-01551
Permite Description: TI: Jeremiah's Italian Ice
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | 7-16-25: not applicable |
| 07/16/2025 | ENGR Engineering Final | N/A | Not Applicable | Interior TI, no exterior work. |
| 04/18/2025 | COT - HCBU - Firewall/Fire Barrier/Firestop | N/A | Re-inspection required | 4-18-25. Nobody on site-no access. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0824-01551
Permit Description: TI: Jeremiah's Italian Ice
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/17/2025 | COT - HCPL - Rough Soil | Passed | Underground plumbing is complete and under water pressure test with no leaks. Okay to shade pipe, backfill trenches, and proceed with doweling of existing concrete call for pre-slab inspection when ready. | |
| 02/07/2025 | COT - HCBU - Preslab | Passed | 2/7/25: All plumbing pipes are properly wrapped with foam and taped. Okay to proceed with concrete pour. | |
| 04/02/2025 | COT - HCBU - Framing | Passed | 4-2-25, approved. | |
| 04/08/2025 | COT - HCEL - Electrical Intermediate | Passed | 4-8-25, Electrical intermediate inspection approved. Okay to continue with construction. | |
| 04/08/2025 | COT - HCPL - Plumbing Intermediate | Passed | 4-8-25, grommets installed throughout, DWV secured & firefoam added at penetrations. Plumbing intermediate inspection approved. | |
| 06/17/2025 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. SUITE 111. 6/17/2025 | |
| 07/16/2025 | TRSP - ROW - Final/Close-Out | Passed | Work completed on private property | |
| 07/16/2025 | COT - HCEL - Electrical Progress | Passed | 7-16-25: approved | |
| 07/16/2025 | COT - HCPL - Plumbing Progress | Passed | 7-16-25: approved | |
| 07/29/2025 | COT - HCBU - Building Above Ceiling | Passed | 7-29-25: approved. | |
| 07/29/2025 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | 7-29-25: approved. | |
| 07/29/2025 | COT - HCEL - Electrical Above Ceiling | Passed | 7-29-25: approved. | |
| 07/29/2025 | COT - HCME - Mechanical Above Ceiling | Passed | 7-29-25:approved. | |
| 07/29/2025 | COT - HCME - Mechanical Intermediate | Passed | 7-29-25: approved. | |
| 07/31/2025 | COT - HCEL - Electrical Final | Passed | All corrections were made. 7/31/2025 | |
| 07/31/2025 | COT - HCPL - Plumbing Above Ceiling | Passed | 7/31/2025 corrections were made. | |
| 07/31/2025 | COT - FCON - Fire - Final | Passed | ||
| 07/31/2025 | COT - FCON - Sprinkler - Final | Passed | ||
| 08/06/2025 | COT - HCBU - Building Final | Passed | Reports have been uploaded and under review. 8/6/2025 | |
| 08/06/2025 | COT - HCBU - CofO | Passed | ||
| 08/06/2025 | COT - HCME - Mechanical Final | Passed | Reports have been uploaded and under review. 8/6/2025 | |
| 08/06/2025 | COT - HCPL - Plumbing Final | Passed | Reports have been uploaded and under review. 8/6/2025 |