Inspection Status: Partial Pass
Inspection History: COT - HCPL - Plumbing Above Ceiling
| Date |
Description |
Inspector |
Results |
Comments |
| 07/16/2025 |
COT - HCPL - Plumbing Above Ceiling |
|
Partial Pass |
7-16-25: insulate hot water copper lines 3/4" or larger. |
| 07/29/2025 |
COT - HCPL - Plumbing Above Ceiling |
|
Re-inspection required |
7-29-25: insulate hot water copper line on water heater with minimum of R3 insulation. |
| 07/31/2025 |
COT - HCPL - Plumbing Above Ceiling |
|
Passed |
7/31/2025 corrections were made. |