Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - HCPL - Plumbing Intermediate
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2025 | COT - HCPL - Plumbing Intermediate | Re-inspection required | 4-2-25, verified DWV under test, however, spacers are required where any copper is making contact with metals. Firefoam any penetrations at top plates. Add spacers throughout, and reschedule when ready. | |
| 04/04/2025 | COT - HCPL - Plumbing Intermediate | Re-inspection required | 4-2-25, verified DWV under test, however, spacers are required where any copper is making contact with metals. Firefoam any penetrations at top plates. Add spacers throughout, and reschedule when ready. 4/4/25: plastic Grommets required where copper piping is penetrating through metallic studs. Insulation has been installed in walls. Please remove insulation from walls in order to conduct inspection. |
|
| 04/08/2025 | COT - HCPL - Plumbing Intermediate | Passed | 4-8-25, grommets installed throughout, DWV secured & firefoam added at penetrations. Plumbing intermediate inspection approved. |