Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Inspection Status: Re-inspection required

Inspection History: COT - HCPL - Plumbing Intermediate 

Date Description Inspector Results Comments
04/02/2025 COT - HCPL - Plumbing Intermediate  Re-inspection required 4-2-25, verified DWV under test, however, spacers are required where any copper is making contact with metals. Firefoam any penetrations at top plates. Add spacers throughout, and reschedule when ready.
04/04/2025 COT - HCPL - Plumbing Intermediate  Re-inspection required 4-2-25, verified DWV under test, however, spacers are required where any copper is making contact with metals. Firefoam any penetrations at top plates. Add spacers throughout, and reschedule when ready.
4/4/25: plastic Grommets required where copper piping is penetrating through metallic studs. Insulation has been installed in walls. Please remove insulation from walls in order to conduct inspection.
04/08/2025 COT - HCPL - Plumbing Intermediate  Passed 4-8-25, grommets installed throughout, DWV secured & firefoam added at penetrations. Plumbing intermediate inspection approved.