Permit: TC-COM-0823-02034
Permit Details
Apply Date:
08/21/2023
Applicant:
Description:
New Indoor Storage Facility
Permit Reviews
Permit Number - TC-COM-0823-02034
Permit Status: Complete
Permit Description: New Indoor Storage Facility
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/27/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/27/2025 | APPROVED |
| 06/27/2024 | COMMERCIAL REVIEW - FULL v.3 | 07/01/2024 | APPROVED |
| 11/06/2024 | RESTAMP - COMMERCIAL v.2 | 11/13/2024 | APPROVED |
| 05/20/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/05/2025 | APPROVED |
| 11/22/2024 | RESTAMP - COMMERCIAL v.1 | 11/29/2024 | APPROVED |
| 08/22/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/26/2025 | REQUIRES RESUBMIT |
| 08/22/2023 | COMMERCIAL REVIEW - FULL v.1 | 02/28/2024 | REQUIRES RESUBMIT |
| 10/31/2024 | COMMERCIAL REVIEW - FULL v.2 | 11/06/2024 | APPROVED |
| 03/28/2024 | COMMERCIAL REVIEW - FULL v.2 | 04/29/2024 | REQUIRES RESUBMIT |
| 12/16/2024 | COMMERCIAL REVIEW - FULL v.1 | 01/03/2025 | REQUIRES RESUBMIT |
| 07/01/2024 | RESTAMP - COMMERCIAL v.1 | 07/31/2024 | REQUIRES RESUBMIT |
| 01/14/2025 | COMMERCIAL REVIEW - FULL v.2 | 01/27/2025 | APPROVED |
| 10/08/2024 | COMMERCIAL REVIEW - FULL v.1 | 10/30/2024 | REQUIRES RESUBMIT |
| 09/03/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 09/05/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0823-02034
Permit Status: Complete
Permit Description: New Indoor Storage Facility
| Date | Description | Comments |
|---|---|---|
| 04/03/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 04/03/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 04/03/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 01/27/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 06/05/2025 | Elevator Designs must be submitted and approved prior to ... | |
| 04/03/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 04/03/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 04/03/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 04/03/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
| 04/03/2024 | Masonry Inspection Report submittal review is required. | |
| 06/05/2025 | Canopy Designs must be submitted and approved prior to ... | |
| 06/05/2025 | Storefront Designs must be submitted and approved prior to ... | |
| 04/03/2024 | Post-Installed Anchor Inspection Report is required. | |
| 07/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 04/03/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 06/05/2025 | Stair Designs must be submitted and approved prior to... | |
| 04/03/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
| 04/03/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0823-02034
Permite Description: New Indoor Storage Facility
Total Outstanding Inspections - 16
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2025 | COT - HCPL - Plumbing Above Ceiling | N/A | Not Applicable | |
| 03/10/2025 | COT - HCBU - Exterior Clips/Sheathing | N/A | Partial Pass | 3-10-25, verified exterior clips/sheathing as per approved plans. Section on east side of building will be inspected at a later date. Okay to proceed with construction at progress areas |
| 12/17/2024 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 3 rd lift at stairs and elevators |
| 01/27/2025 | COT - HCBU - Framing | N/A | Partial Pass | Level one. |
| 01/27/2025 | COT - HCBU - Interior Shear Bracing | N/A | Partial Pass | Metal braces. |
| 11/06/2024 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Two elevator footings. |
| 01/27/2025 | COT - HCBU - Preslab | N/A | Partial Pass | Level Two. |
| 12/10/2024 | COT - HCEL - Electrical Underground | N/A | Partial Pass | 2" conduit from street to building at South End. |
| 12/26/2024 | BULD - Electrical Clearance | N/A | Partial Pass | Clearance for TEP TMPP. 12/26/2024 |
| 12/27/2024 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | 12/27/2024 6th lift at both Stair towers. NW&SE. okay to grout progress areas. |
| 08/04/2025 | COT - HCPL - Backwater Valve | N/A | Not Applicable | |
| 08/04/2025 | COT - BULD - SWG Clearance | N/A | Not Ready | |
| 08/14/2025 | COT - FCON - Sprinkler - Final | N/A | Partial Pass | Bell shall be provided. |
| 08/14/2025 | COT - FCON - Alarm - Final | N/A | Partial Pass | Need Elevator report, ERCES report from PCWIN and testing, gas detection system tied to fire alarm. |
| 08/27/2025 | COT - HCBU - TCO | N/A | Not Applicable | All building items complete; OK for C of O. |
| COT - FCON - Fire - Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0823-02034
Permit Description: New Indoor Storage Facility
Total Completed Inspections - 31