Permit: TC-COM-0724-01425
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
1226 W IRVINGTON RD UNIT 150
Address NEW:
1226 W IRVINGTON RD UNIT 150
Apply Date:
07/25/2024
Applicant:
alex enoch
Description:
existing office converted to new pinkberry (restaraunt)
Permit Reviews
Permit Number - TC-COM-0724-01425
Permit Status: Complete
Permit Description: existing office converted to new pinkberry (restaraunt)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/20/2024 | COMMERCIAL REVIEW - LIMITED v.2 | 08/23/2024 | REQUIRES RESUBMIT |
| 07/26/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 08/13/2024 | REQUIRES RESUBMIT |
| 08/23/2024 | COMMERCIAL REVIEW - LIMITED v.3 | 08/26/2024 | APPROVED |
| 04/04/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/14/2025 | APPROVED |
| 03/19/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/02/2025 | APPROVED |
| 08/26/2024 | RESTAMP - COMMERCIAL v.1 | 08/27/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0724-01425
Permit Status: Complete
Permit Description: existing office converted to new pinkberry (restaraunt)
| Date | Description | Comments |
|---|---|---|
| 07/25/2024 | Please contact Pima County Addressing to verify official address. Addressing@pima.gov or 520-724-9512 | |
| 07/25/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 03/12/2025 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 03/12/2025 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor. | |
| 03/12/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0724-01425
Permite Description: existing office converted to new pinkberry (restaraunt)
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 09/30/2024 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 10/02/2024 | COT - HCBU - Framing | N/A | Partial Pass | All corrections were made. Partial pass hard lids areas. Okay to proceed progress areas. 10/2/2024 |
| 08/29/2024 | COT - HCPL - Plumbing Progress | N/A | Re-inspection required | 8/29/24: no approved signs on site. |
| 10/02/2024 | COT - HCEL - Electrical Above Ceiling | N/A | Partial Pass | All corrections were made. Partial pass hard lids areas. Okay to proceed progress areas. 10/2/2024 |
| 10/02/2024 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | All corrections were made. Partial pass hard lids areas. Okay to proceed progress areas. 10/2/2024 |
| 10/02/2024 | COT - HCME - Mechanical Above Ceiling | N/A | Partial Pass | All corrections were made. Partial pass hard lids areas. Okay to proceed progress areas. 10/2/2024 |
| 10/02/2024 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | All corrections were made. Partial pass hard lids areas. Okay to proceed progress areas. 10/2/2024 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0724-01425
Permit Description: existing office converted to new pinkberry (restaraunt)
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/30/2024 | COT - HCPL - Rough Soil | Passed | 8/29/24: approved plans must be present at time of inspection. 8/30/24: plumbing underground per plans ok to proceed |
|
| 10/02/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 01/22/2025 | COT - HCBU - Framing | Passed | ||
| 01/22/2025 | COT - HCPL - Plumbing Progress | Passed | ||
| 01/22/2025 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 01/22/2025 | COT - HCME - Mechanical Progress | Passed | ||
| 01/22/2025 | COT - HCBU - Building Above Ceiling | Passed | ||
| 01/22/2025 | COT - HCBU - Building Progress | Passed | ||
| 01/22/2025 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 01/22/2025 | COT - HCEL - Electrical Intermediate | Passed | ||
| 01/22/2025 | COT - HCEL - Electrical Progress | Passed | ||
| 01/22/2025 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 01/22/2025 | COT - HCME - Mechanical Intermediate | Passed | ||
| 01/23/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 01/23/2025 | ENGR Engineering Final | Passed | No issues, CO Approved | |
| 02/25/2025 | COT - HCME - Mechanical Final | Passed | 2-25-25, mechanical final approved. | |
| 02/25/2025 | COT - FCON - Sprinkler - Final | Passed | ||
| 02/25/2025 | COT - FCON - Fire - Final | Passed | ||
| 02/25/2025 | COT - HCEL - Electrical Final | Passed | 2-25-25, electrical final approved. | |
| 03/07/2025 | COT - HCBU - Building Final | Passed | ||
| 03/07/2025 | COT - HCPL - Plumbing Final | Passed | ||
| 03/07/2025 | COT - HCBU - CofO | Passed |