Permit Details

Status:
In Review
Type:
Commercial Building
Address:
10000 S RITA RD
Address NEW:
10000 S RITA RD
Apply Date:
06/11/2026
Applicant:
Daniel Osete
Description:
Construction of a 60' x 40' pre-engineered metal building (PEMB) including office build-out and a restroom, along with associated site improvements such as grading and utilites.

Permit Reviews

Permit Number - TC-COM-0626-00869
Permit Status: In review
Permit Description: Construction of a 60' x 40' pre-engineered metal building (PEMB) including office build-out and a restroom, along with associated site improvements such as grading and utilites.
Start Date Submittal Complete Date Status  
08/14/2026 COMMERCIAL REVIEW - FULL v.2 N/A IN REVIEW Review Details
06/16/2026 COMMERCIAL REVIEW - FULL v.1 07/10/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0626-00869
Permit Status: In review
Permit Description: Construction of a 60' x 40' pre-engineered metal building (PEMB) including office build-out and a restroom, along with associated site improvements such as grading and utilites.
Total Outstanding Activity Conditions - 10
Date Name
06/16/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
07/09/2026 AIR BALANCING REPORT IS REQUIRED.
07/09/2026 Pre-Engineered Metal Building (PEMB) Construction Plans and Structural Calculations must be submitted and approved prior to the foundation inspections. The PEMB documents must be reviewed and stamped by the Engineer of Record(EOR) and then Approved by the Building Safety prior to foundation inspection and PEMB installation.
07/09/2026 Separate submittal to PC RWRD is required for new septic system. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
07/09/2026 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
07/09/2026 WATER STERILIZATION REPORT IS REQUIRED.
09/02/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
09/02/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/02/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
09/02/2026 Prior to Final - Required Documents - Post-Installed Anchor Inspection Report is required.

Conditions

Permit Number - TC-COM-0626-00869
Permit Status: In review
Permit Description: Construction of a 60' x 40' pre-engineered metal building (PEMB) including office build-out and a restroom, along with associated site improvements such as grading and utilites.
Date Description Comments
06/16/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.