Permit: TC-COM-0625-01202
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
3210 E VALENCIA RD
Address NEW:
3210 E VALENCIA RD
Apply Date:
06/23/2025
Applicant:
Andrew Venne
Description:
Interior Remodel of existing restaurant. REV #1 - changed from gas tank water heater to tankless water heaters
Permit Reviews
Permit Number - TC-COM-0625-01202
Permit Status: Complete
Permit Description: Interior Remodel of existing restaurant.
REV #1 - changed from gas tank water heater to tankless water heaters
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/11/2025 | RESTAMP - COMMERCIAL v.1 | 08/13/2025 | APPROVED |
| 11/12/2025 | COMMERCIAL REVIEW - FULL REVISION v.2 | 11/14/2025 | REQUIRES RESUBMIT |
| 12/10/2025 | COMMERCIAL REVIEW - FULL REVISION v.2 | 12/11/2025 | REQUIRES RESUBMIT |
| 03/03/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/06/2026 | APPROVED |
| 06/26/2025 | COMMERCIAL REVIEW - FULL v.1 | 07/22/2025 | REQUIRES RESUBMIT |
| 12/15/2025 | COMMERCIAL REVIEW - FULL REVISION v.3 | 01/15/2026 | APPROVED |
| 08/08/2025 | COMMERCIAL REVIEW - FULL v.3 | 08/11/2025 | APPROVED |
| 11/14/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 12/08/2025 | REQUIRES RESUBMIT |
| 07/24/2025 | COMMERCIAL REVIEW - FULL v.2 | 07/24/2025 | REQUIRES RESUBMIT |
| 10/16/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 11/07/2025 | REQUIRES RESUBMIT |
| 08/13/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/15/2025 | APPROVED |
| 03/20/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/24/2026 | APPROVED |
Conditions
Permit Number - TC-COM-0625-01202
Permit Status: Complete
Permit Description: Interior Remodel of existing restaurant.
REV #1 - changed from gas tank water heater to tankless water heaters
| Date | Description | Comments |
|---|---|---|
| 08/13/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 06/26/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 07/17/2025 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 07/17/2025 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor. | |
| 06/26/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/13/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0625-01202
Permite Description: Interior Remodel of existing restaurant.
REV #1 - changed from gas tank water heater to tankless water heaters
Total Outstanding Inspections - 11
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2026 | BULD - Electrical Clearance | N/A | Not Applicable | 2-6-26; not applicable |
| 10/10/2025 | COT - LCBU - Framing | N/A | Partial Pass | 10-10-25: interior framing verified per plans, however, a revision is required showing the exclusion of 2 walls located at the cashier/pizza prep. |
| 10/01/2025 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | 10-1-25: label all junction boxes above ceiling-okay to continue construction at progress areas. |
| 02/06/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | 2-6-26; not applicable |
| 02/06/2026 | COT - FCON - Alarm - Final | N/A | Not Applicable | |
| 10/14/2025 | COT - LCPL - Plumbing Intermediate | N/A | Partial Pass | 10-14-25: in wall domestic, DWV, & grease interceptor verified under test. Plastic bushings for in wall domestic at metal framing in place. Provide a plastic bushings around DWV making contact with metal framing at order/cashier location-Provide a picture prior to closing wall. Verified that all penetrations separating the suite at the east wall have been properly sealed. Okay to continue with TI at progress areas. Note: verified gas line test at 15 psi, however, all gas appliances require shut off valves prior to clearance being issued SWG. |
| 02/06/2026 | COT - LCPL - Gas Pressure Test | N/A | Not Applicable | 2-6-26; not applicable |
| 02/06/2026 | COT - LCBU - Preslab | N/A | Not Applicable | 2-6-26; not applicable |
| 02/06/2026 | COT - LCPL - Rough Soil | N/A | Not Applicable | 2-6-26; not applicable |
| 02/06/2026 | COT - FCON - Fire - Final | N/A | Partial Pass | Occupancy load sign shall be provided, Address shall be a contrasting color to the building, a Places of Assembly permit shall be applied for. |
| 11/17/2025 | COT - LCME - Mechanical Final | N/A | Re-inspection required | 11-17-25: remove damaged/cut section of fire wrap and re-install. Schedule an inspection when ready. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0625-01202
Permit Description: Interior Remodel of existing restaurant.
REV #1 - changed from gas tank water heater to tankless water heaters
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2026 | COT - FCON - Hood System - Final | Passed | Approved on 1/29/26 on permit TF-FCP-1225-01016 | |
| 02/06/2026 | COT - LCBU - Framing | Passed | 2-6-26: approved. | |
| 02/06/2026 | COT - LCEL - Electrical Intermediate | Passed | 2-6-26: approved. | |
| 02/06/2026 | COT - LCPL - Plumbing Intermediate | Passed | 2-6-26: plumbing intermediate approved. | |
| 02/06/2026 | COT - LCEL - Electrical Above Ceiling | Passed | 2-6-26: approved. | |
| 02/06/2026 | COT - LCME - Kitchen Hood | Passed | 2-6-26: approved | |
| 02/06/2026 | COT - LCME - Mechanical Intermediate | Passed | 2-6-26: mechanical intermediate approved. | |
| 02/27/2026 | COT - FCON - Fire - Final | Passed | ||
| 03/03/2026 | COT - LCBU - Building Final | Passed | 3-3-26: building final approved. Note: See pending conditions. |
|
| 03/03/2026 | COT - LCME - Mechanical Final | Passed | 3-3-26: mechanical final approved. | |
| 03/03/2026 | COT - LCPL - Plumbing Final | Passed | 3-3-26: plumbing final approved. | |
| 03/03/2026 | COT - LCEL - Electrical Final | Passed | 3-3-26: electrical final approved. |