Inspection Status: Passed
Inspection History: COT - LCBU - Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 02/06/2026 |
COT - LCBU - Framing |
|
Passed |
2-6-26: approved. |
| 10/01/2025 |
COT - LCBU - Framing |
|
Re-inspection required |
10-1-25: add shot pins 24" o.c. and provide kickers 48" o.c. with proper angle clips and correct # of screws. Also, submit a letter to the city for drywall that has been taped. The letter itself must be submitted by a licensed contractor indicating that nailing was done per the 2018IBC and meets ASTM standards. See A7/detail 7 and schedule this portion of framing inspection when ready. Finally, submit an updated floor plan showing the exclusion of wall at cashier/order area. |
| 10/10/2025 |
COT - LCBU - Framing |
|
Partial Pass |
10-10-25: interior framing verified per plans, however, a revision is required showing the exclusion of 2 walls located at the cashier/pizza prep. |